100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
NERC EXAM, TEST, PRACTICE EXAM AND STUDY GUIDE LATEST ACTUAL EXAM 600+ QUESTIONS AND CORRECT DETAILED ANSWERS WITH RATIONALES (VERIFIED ANSWERS) |ALREADY GRADED A+ $28.99   Add to cart

Exam (elaborations)

NERC EXAM, TEST, PRACTICE EXAM AND STUDY GUIDE LATEST ACTUAL EXAM 600+ QUESTIONS AND CORRECT DETAILED ANSWERS WITH RATIONALES (VERIFIED ANSWERS) |ALREADY GRADED A+

 0 view  0 purchase
  • Course
  • Institution

NERC EXAM, TEST, PRACTICE EXAM AND STUDY GUIDE LATEST ACTUAL EXAM 600+ QUESTIONS AND CORRECT DETAILED ANSWERS WITH RATIONALES (VERIFIED ANSWERS) |ALREADY GRADED A+ NERC EXAM, TEST, PRACTICE EXAM AND STUDY GUIDE LATEST ACTUAL EXAM 600+ QUESTIONS AND CORRECT DETAILED ANSWERS WITH RATIONA...

[Show more]

Preview 4 out of 145  pages

  • November 17, 2023
  • 145
  • 2023/2024
  • Exam (elaborations)
  • Questions & answers
avatar-seller
NERC EXAM, TEST, PRACTICE EXAM AND STUDY GUIDE
LATEST 2023-2024 ACTUAL EXAM 600+ QUESTIONS AND
CORRECT DETAILED ANSWERS WITH RATIONALES
(VERIFIED ANSWERS) |ALREADY GRADED A+

1. If a 500 kV transmission line with a surge impedance loading of 800 MW
is currently loaded at 1400 MW, which of the following events would most
likely occur?


a. Generator MVAR output would increase
b. All system capacitors would trip off-line
c. Generator MVAR output would decrease
d. All automatic reactors would connect to the system - ANSWER-a.
Generator MVAR output would increase


2. When system conditions are such that emergency procedures are
expected to be implemented, which of the following actions should be
considered first?


a. Shed firm load
b. Implement Active Load Management
c. Return outaged equipment to service
d. Request a voltage reduction - ANSWER-c. Return outaged equipment to
service


3. If your transmission path is rated for 1200 MW and 1000 MW are
scheduled on it, but due to parallel flows the actual flow is 1300 MW, what
action should you take?


a. Request that a phase shifting transformer be installed

, NERC EXAM, TEST, PRACTICE EXAM AND STUDY GUIDE
LATEST 2023-2024 ACTUAL EXAM 600+ QUESTIONS AND
CORRECT DETAILED ANSWERS WITH RATIONALES
(VERIFIED ANSWERS) |ALREADY GRADED A+
b. Reduce interchange transactions impacting the path
c. Request all parallel flow to PSEs to increase schedules
d. Reduce all commercial customer load - ANSWER-b. Reduce
interchange transactions impacting the path


4. If your system is MVAR deficient, what action could be implemented to
prevent voltage collapse?


a. Raise system frequency above 60.5 Hz
b. Shed firm load in the deficient area
c. Separate from the Interconnection
d. Lower transmission voltages - ANSWER-b. Shed firm load in the
deficient area


5. Which of the following actions can a system operator take in order to
maintain stability on the system?


a. Request generators to absorb maximum MVAR
b. Place all operating limits on dynamic calculation
c. Raise system voltages as high as possible, but within their operating
parameters
d. Reduce voltages on the transmission system - ANSWER-c. Raise
system voltages as high as possible, but within their operating parameters


6. Which of the following actions should you take if an outage on a
neighboring system has caused a violation on your system?

, NERC EXAM, TEST, PRACTICE EXAM AND STUDY GUIDE
LATEST 2023-2024 ACTUAL EXAM 600+ QUESTIONS AND
CORRECT DETAILED ANSWERS WITH RATIONALES
(VERIFIED ANSWERS) |ALREADY GRADED A+

a. Open all tie-lines to your neighbor
b. Ask the Reliability Coordinator for assistance
c. Shed load to mitigate the violation
d. Wait for the neighboring system to contact you - ANSWER-b. Ask the
Reliability Coordinator for assistance


7. If a SOL or IROL violation occurs due to transfers across the system and
it is determined that parallel flows are contributing to the violation, what
should the system operator do?


a. Place all system capacitors in service
b. Reduce system load
c. Inform the Reliability Coordinator
d. Dump firm load - ANSWER-c. Inform the Reliability Coordinator


8. While performing a pre-outage study, you identify that the transmission
outage will cause a thermal violation on a parallel path, which of the
following actions would be the first one you would implement?


a. Shed load to mitigate the concern
b. Allow the outage to occur and see what happens
c. Reschedule the outage if possible
d. Allow the outage to take place as long as no load is lost - ANSWER-c.
Reschedule the outage if possible

, NERC EXAM, TEST, PRACTICE EXAM AND STUDY GUIDE
LATEST 2023-2024 ACTUAL EXAM 600+ QUESTIONS AND
CORRECT DETAILED ANSWERS WITH RATIONALES
(VERIFIED ANSWERS) |ALREADY GRADED A+
9. Which of the following actions should the system operator implement first
if transmission line limits exceed the facilities emergency limits based on a
contingency that has not yet occurred, but their protocols are to respond on
a pre-contingency basis?


a. Reduce voltages in the area of the violation
b. Remove the facility from service
c. Curtail any interchange transactions that are curtailable
d. Only implement actions if the contingency occurs - ANSWER-c. Curtail
any interchange transactions that are curtailable


10. If a Reliability Coordinator had to implement any type of line loading
relief procedures, which of the following entities would they be coordinated
with? Pick two.


a. Purchasing Selling Entities
b. Balancing Authorities
c. Transmission Operators
d. Load Serving Entities - ANSWER-b. Balancing Authorities
c. Transmission Operators


11. If a generator is lost in a neighboring Balancing Area, what would the
impact be on the BAs transmission tie lines?


a. Nothing
b. A net increase of MW would come into your BAs system

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller erickarimi. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $28.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

73091 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$28.99
  • (0)
  Add to cart