Miller Act 1935 - -Federal Government passed bond requiring payment and
performance bonds on all public works, what year?
-Brooks Bill 1972 - -Bill directing A/E's selected on qualifications, what year?
-Clinger Cohen Act/Defense Procurement Reform Act 1996 - -Allows all federal
agencies to utilize Design-Build. Prior to that no enabling legislation existed allowing
Design-Build.
-Standard of Care - -The level of quality that any average Design Professional would be
able to perform given the circumstances.
-Design Bid Build - -Slowest Project Delivery method, linear in nature, prescriptive
(owner knows what they want),
-Multi Prime - -Project Delivery - Many contracts through Owner
-CM at Risk - -Project Delivery method allowing the contractor to come on board very
early in design for preconstruction services yet maintains separation between Designer
and Builder contractually.
-Design Build - -Fastest Project Delivery method, fast tracking possible overlapping
design with construction utilizing incremental packages.
-Low Bid - -Procurement Method - Most Familiar
-Negotiated (Qualifications Based) - -Procurement Method - Common for A/E
-Best Value - -Procurement Method - Qualifications and Price
-Sole Source - -Procurement Method - Direct
-Lump Sum - -Contract Format w/ agreed upon fixed price
-Cost Plus Fee - -Contract Format - contractor reimbursed for actual cost plus an
agreed upon percentage
-GMP (Guaranteed Maximum Price) - -Contract Format - Combines Cost-Plus &
Lump-Sum, contractor reimbursed for actual cost plus a fee only up to a certain amount.
, -Unit Price - -Contract Format - cost per piece
-Target Price - -Contract Format - established cost/benchmark determined jointly by
project team.
-Hammurabi - -Singular responsibility for both design & construction was first codified
by ____
-Bridging Documents - -Owner provided items such as 20% design or more and
provides prescriptive specs at RFP.
-Spearin Doctrine - -Owner is responsible for implied warranties in the sufficiency of
the specifications.
-Performance Requirements - -____ ____ should identify end results.
-Design Build - -Single point of responsibility for both design & construction is an
attribute of what delivery method?
-Substantiation - -The process of checking milestones along the way for completeness.
-Prescriptive - -Owner requiring specific products or methods be instituted by DB team
in order to achieve desired performance.
-False - -T/F Detailed estimating is the Building systems approach to estimating
-False - -T/F feasibility estimate is cost model and establishes budget for project
-True - -T/F key element of quality assurance is keeping communication lines open
between owner and DB
-True - -T/F in Design/cost relationship of DB, the constructor establishes design
parameters for architect
-False - -T/F trust is most important thing for DB
-Schematic estimating - -DB estimating sequence where 15%-20% of design is
completed
-Trend logs - -Provides baseline budgets and schedules and list estimate trends
-Committed Design - -Drawings and specs are approved by DOR and confirmed within
budget
The benefits of buying summaries with Stuvia:
Guaranteed quality through customer reviews
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
Quick and easy check-out
You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.
Focus on what matters
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
Frequently asked questions
What do I get when I buy this document?
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Satisfaction guarantee: how does it work?
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Who am I buying these notes from?
Stuvia is a marketplace, so you are not buying this document from us, but from seller Nurselucy2023. Stuvia facilitates payment to the seller.
Will I be stuck with a subscription?
No, you only buy these notes for $7.99. You're not tied to anything after your purchase.