100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
Mobile Crane Review Questions & Correct Answers $19.99   Add to cart

Exam (elaborations)

Mobile Crane Review Questions & Correct Answers

 3 views  0 purchase
  • Course
  • Institution

Mobile Crane Review Questions & Correct Answers

Preview 3 out of 20  pages

  • January 6, 2024
  • 20
  • 2023/2024
  • Exam (elaborations)
  • Questions & answers
avatar-seller
Mobile Crane Operator Core Review Questions

Distribute over a larger area. Correct Ans - What is the purpose of
placing mats or cribbing under outrigger floats?



Upperworks. Correct Ans - Where is the best location for leveling a
crane?



there is no weight of the crane bearing on any tires Correct Ans -
Before leveling a mobile crane on outriggers, an operator should ensure:



Operating a mobile crane with a long boom, on uneven ground, what
support condition should be considered? Correct Ans - Keeping a
90° angle between cylinder rod and pad.



Operating a mobile crane with a long boom, on uneven ground, what
support condition should be considered? Correct Ans - Keeping 90°
angle between cylinder rod and pad.



When may blocking (cribbing) be placed under outrigger beams on mobile
cranes? Correct Ans - Never approved.



Mobile cranes should be level to within what percent of grade? Correct
Ans - 1%



Timber crane mats work best when they are: Correct Ans - bolted
together.

,When arriving in the crane at the job site, the operator should first
determine the condition of the: Correct Ans - access roads.



What surface listed below would NOT be a good location for assembly or
setup of a mobile crane? Correct Ans - Above underground vaults.



Each outrigger pad and its blocking should be sufficient to support?
Correct Ans - The total weight of the crane and its load.



How does high wind affect a mobile crane with a long boom? Correct
Ans - Introduces side load onto the boom



When is the only time the outrigger beams should be less than fully

extended? Correct Ans - The load chart indicates that this is
allowed.



What is the primary purpose for a rooster sheave or auxiliary boom point
sheave? Correct Ans - Separate the load hoist lines.



Eccentric main boom tip reeving causes which of the following: Correct
Ans - twisting of the main boom.



Which type of wire rope listed below is installed on most cranes?
Correct Ans - Right regular lay.

, The hoist drum flange shall extend a minimum of _______ over the top layer
of wire rope at all times while crane is in operation. Correct Ans -
1/2 inch.



Which of the following is classified as a standing wire rope? Correct
Ans - Pendant line.



When lifting on outriggers, the floats or pads should always be: Correct
Ans - secured to the outriggers cylinder.



How many randomly broken wires in a lay length must there be on a
mobile cranes hoist line, before it should be removed from service?
Correct Ans - 6



What is the minimum design factor required for a right regular lay, boom or
hoist wire rope? Correct Ans - 3.5



On a mobile crane, how many broken wires are permitted at the end

connection of a pendant before it must be taken out of service? Correct
Ans - 1



Type 1 rotation resistant hoist wire rope has a design factor of: Correct
Ans - 5 to 1

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller Studyhall. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $19.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

79271 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$19.99
  • (0)
  Add to cart