100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
Mobile Crane Questions Test #2 – Q&A 100% Correct $8.99   Add to cart

Exam (elaborations)

Mobile Crane Questions Test #2 – Q&A 100% Correct

 5 views  0 purchase
  • Course
  • Institution

Mobile Crane Questions Test #2 – Q&A 100% Correct

Preview 2 out of 5  pages

  • January 6, 2024
  • 5
  • 2023/2024
  • Exam (elaborations)
  • Questions & answers
avatar-seller
Mobile Crane Questions Test #2 – Q&A 100% Correct

When making a multiple crane lift it is important for the operator to
understand that: Correct Ans - The weight may increase if the other
crane lands the load.

If a crane is not set-up level and the operator swings a load from the high
side, the load radius will: Correct Ans - Increase.

Most crane manufacturers reduce load capacity for duty-cycle operations
because: Correct Ans - Side-loading forces may occur.

On whose recommendations should preventative maintenance program be
set-up: Correct Ans - C rane manufacturer.

What is the standard rope used on most cranes? Correct Ans - Right
regular lay.

The proper way to calibrate a boom angle indicator is: Correct Ans -
Using a level, raise the boom horizontal and set the indicator at 0º.

The red area of a instrument gauge means: Correct Ans - A
dangerous condition exists.

The best way to keep people from being injured from the counterweight of
crane is to: Correct Ans - Fence or barricade the tail swing area of
the crane.

Only approved attachments or extra counterweights made by the
manufacturer should be placed on the rear of the crane because:
Correct Ans - They could cause a backward stability problem.

What is the first thing an operator should do before going under a low pipe
rack? Correct Ans - Post a signal person to check clearance.

When working on outriggers, the only time they should be less than fully
extended is when: Correct Ans - There is a load chart for this
operation.

, When lifting loads from the water, the operator should be aware that:
Correct Ans - The load will increase when you pick the load from the
water.

What is required to be on a hydraulic crane in order for it to lift a
manbasket? Correct Ans - Boom length indicator.

When working on rubber, cranes are rated at what percentage of tipping?
Correct Ans - 75%

When using cable or nylon spreaders it is important to remember:
Correct Ans - The lower the spreader angle to the horizontal, the
greater the tension.

Backward stability of a crane is tested with: Correct Ans - Basic
boom at maximum angle with no load.

If not listed in the load/capacity charts for the hydraulic crane and you are
in between boom lengths, you should:: Correct Ans - Use the next
longer or shorter length (the lower capacity).

When spinning the load presents a danger, the operator should:
Correct Ans - Use a tagline.

The jib capacity is 8 tons and the ball weight 900 lbs. What is the heaviest
net load that can be lifted safely? Correct Ans - 15,100.

Parts of line means: Correct Ans - The number of lines running
through the load block.

If a jib is erected but not being used, it is treated as a deduction from the
cranes: Correct Ans - Gross capacity.

What is the maximum number of broken wires acceptable before
replacement on a standing wire rope? (In areas beyond end connections)
Correct Ans - 2.

What are most jib capacities based on? Correct Ans - Structural.

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller Studyhall. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $8.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

79271 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$8.99
  • (0)
  Add to cart