CSCI 202 2A Final Exam Questions and Answers Latest 2024 Graded A+ (Community College of Philadelphia)
CSCI 202 2A Final Exam Questions and Answers Latest 2024 Graded A+ (Community College of Philadelphia). Which one of the following organizations would evaluate measures of effectiveness (MOEs) to determine how well a munitions system can perform its mission? Marine Corps Operational Test and Evaluation Activity (MCOTEA) Marine Corps Systems Command (MARCORSYSCOM) Defense Contract Management Agency (DCMA) Joint Interoperability Test Command (JITC) 4) Which one of the following test and evaluation (T&E) products is required at Milestone C? Early Operational Assessment (EOA) Operational Assessment (OA) Results Live Fire Test and Evaluation (LFT&E) Report CSCI 202 2A Final Exam Questions and Answers Latest 2023/2024 Graded A+ (Community College of Philadelphia) CSCI 202 2A Final Community College of Philadelphia DOT&E Report on Initial Operational Test and Evaluation (IOT&E) 5) Applying the Integrated Product and Process Development (IPPD) Management philosophy can result in significant benefits to the customer, DoD, and industry. Some of the primary benefits are reduced cost, increased quality, and . lower training requirements reduced risk increased schedule time reduced planning time 6) How does a program management office show the sequence and interrelationship of all the business and technical activities required to accomplish the acquisition? Acquisition Strategy - Program Structure Chart Integrated Product and Process Development (IPPD) Plan Integrated Systems Engineering/Business Management Plan Risk Management Plan 7) At which point in the life cycle does the Life Cycle Sustainment Plan (LCSP) focus on development of sustainment metrics to influence design, the product support strategy, and on actions that can be taken prior to the next milestone to reduce future operating and support costs? FRP (P&D Phase) Milestone B (EMD Phase) IOC (O&S Phase) Milestone A (TMRR Phase) ------------------------- 1) If the program is on the DOT&E Oversight List, which one of the CSCI 202 2A Final Community College of Philadelphia CSCI 202 2A Final Community College of Philadelphia Live Fire T&E Waiver DOT&E Report on Initial Operational Test and Evaluation (IOT&E) LRIP Article Quantities Approval Early Operational Assessment 2) Threshold values, establishing (minimum) parameters for a system, and objective values, establishing desired parameters for a system, can be found in the: Acquisition Program Baseline Integrated Systems Engineering/Business Management Plan Initial Capabilities Document Acquisition Strategy 3) Design of Experiments (DOE) can have a positive impact on test and evaluation (T&E) resources by providing an efficient/effective means to ascertain the appropriate test sample sizes and therefore enable reductions in cost and schedule. True False 4) Who would certify the interoperability performance of a command and control system used by both the Army and the Navy? Joint Requirements Oversight Council (JROC) Joint Staff Joint Interoperability Test Command (JITC) Army Test and Evaluation Command (ATEC) and Navy Operational Test and Evaluation CSCI 202 2A Final Community College of Philadelphia Activity (OPTEVFOR) 5) At which point in the life cycle does the Life Cycle Sustainment Plan (LCSP) focus on refining the execution plan for the design, acquisition, fielding, and competition of sustainment activities? Milestone C (P&D Phase) Milestone A (TMRR Phase) Milestone B (EMD Phase) IOC (O&S Phase) PART @ 1) Which of the following exceptions to the full funding policy would allow the Government to budget for buying three years’ worth of engines under one contract in order to save money? Incremental Multiyear Procurement Low Rate Initial Production (LRIP) Advance Procurement 2) To minimize software development risk, select a contractor who: Complies with quality standard MIL-Q9858A Relies on leading edge approaches and the latest state-of-the-art tools for software development Can demonstrate process maturity and domain expertise Is rated Level 1 on the Standard Capability Maturity Model Integration Appraisal Method for Process Improvement (SCAMPI) 3) If the Government has funded the entire development of an item, the Government is entitled to rights. CSCI 202 2A Final Community College of Philadelphia Restricted Unlimited Government purpose Limited 4) Which of the following are "best practices" that may be appropriate for software intensive programs (Select all that apply)? Generate new code whenever possible To speed development, only test software at completion Consider the risks of reusing existing software Use metrics to manage and monitor risk 5) Responsibility for awarding the contract and any modifications for Government contracts rests with the . Head of the Contracting Agency Contracting Officer Program Manager Defense Contract Audit Agency 6) Market research and analysis shall also be conducted to identify and evaluate possible and throughout research and development. acquisition approaches / test strategies product value / product complexity CSCI 202 2A Final Community College of Philadelphia CSCI 202 2A Final Community College of Philadelphia schedule delays / cost increases dual use technologies / commercial suppliers 7) Earned value management (EVM) reports are available to help the program manager (PM) track the contractor’s cost, schedule, and performance against a Performance Measurement Baseline. True False 8) When selecting a software developer, which of the following should contractors possess (Select all that apply)? Demonstrable mature software development capability and process Successful past performance record Maturity level four Domain experience in developing comparable software systems 9) Each Component (Services/Agencies) uses the guidance provided by the Planning phase of the Planning, Programming, Budgeting, and Execution (PPBE) process to prepare its proposal for all available resources, including funding, force structure and personnel end strength, over a five year period. This proposal, submitted to the Secretary of Defense, is known as the: Program Objectives Memorandum (POM) Budget Estimate Submission (BES) Defense Planning Guidance (DPG) President's Budget (PB) 10) If your procurement budget request did not provide for buying a whole number of useable end items, this would be a violation of CSCI 202 2A Final Community College of Philadelphia which funding policy? Incremental Funding Full Funding Deficit Funding Annual Funding 11) In order to ensure that a contractor has an acceptable quality assurance system in place, the Government can require that a contractor be ISO 9001 compliant. True False 12) Match the contract type with its best description. a) Cost Plus Incentive Fee (CPIF) b) Fixed Price Incentive FPI) c) Cost Plus Fixed Fee (CPFF) d) Cost Plus Award Fee (CPAF) A ceiling price is established B Requires subjective evaluation of the contractor D Must have maximum/minimum fee amounts A The fee amount doesn't change C 13) Financial managers use escalation to consider the effects of 4 CSCI 202 2A Final Community College of Philadelphia inflation on an acquisition program by applying: Inflation factors to actual costs incurred by the contractor Full funding policy to defense procurement appropriations requested in the budget Incremental funding policy to Research, Development, Test, and Evaluation (RDT&E) appropriations requested in the Program Objectives Memorandum (POM) Compound and composite indices to program cost estimates 14) A is an aggregation of program elements that reflects a macro-level force mission or support mission of DoD. Program Objectives Memorandum (POM) Future Years Defense Program (FYDP) Major Force Program (MFP) Budget 15) Contracts greater than $100,000 are reserved for small business. True False 16) To ensure interoperability, compliance with the DoD IT Standards Registry (DISR) is required for all command, control, communications, computers, and intelligence (C4I) systems and automated information systems acquired within DoD. True False 17) The phase translates planning decisions, OSD CSCI 202 2A Final Community College of Philadelphia Planning Execution Programming Budgeting 1) Software is an area NOT subject to interoperability issues. True False 2) Escalation allows us to make predictions about future costs based on: Expected inflation and outlay rates Expected outlay rates and affordability trade-offs Expected cost/performance trade-offs and affordability analyses Expected inflation rates and affordability analyses 3) The Government must conduct appropriate market research before soliciting offers from potential contractors. Various IPT members can participate. Cost analysts can provide input on . modifying the user’s requirements modifying the available products developing product descriptions proper contract pricing information 4) If a contractor chooses to use their own quality system, they must demonstrate compliance with the established military CSCI 202 2A Final Community College of Philadelphia standard through formal third party certification. True False 5) What is the Government's basic purpose of using the Capability Maturity Model Integration (CMMI) and the associated Standard CMMI Appraisal Method for Process Improvement (SCAMPI) assessment process? It is a model of the specific software to be used in a program. Uses a four-level capability scale and a five-level maturity scale to rate potential commercial software developers’ capabilities on their ability to produce software at a predicted cost and schedule. Allows the contractor to rate their own software development processes and experience on a multi-level scale. The Government would then look at the contractor's self-assessment to produce defect-free software at a predicted cost and schedule. Is used by contractors to show clients how capable they are in developing various types of software. 1) When selecting a software developer, years of experience in the software business should be the most important consideration. The amount of experience a contractor has developing the specific type of software needed is not as important as experience in general. True False 2) When financial managers adjust for cost inflation in programming and budgeting, they usually: Refer to Federal Reserve Board guidelines on outlay rates and income flows Prepare initial estimates in base-year (constant) dollars and escalate costs into then-year (current) dollars CSCI 202 2A Final Community College of Philadelphia 4) Which of the following is a key tenet of Integrated Product and Process Development (IPPD)? [5a. Relate the key tenets of Integrated Produce and Process Development (IPPD) to planning and executing an acquisition program.] [Remediation Revise their Program Objectives Memorandum (POM) submission based on the Resource Management Decision (RMD) released by the Deputy Secretary of Defense Expect investment appropriations, such as Procurement and Research, Development, Test, and Evaluation (RDTE), to have quick outlay rates 1) If the program is on the DOT&E Oversight List, which one of the following test and evaluation (T&E) products is required before the Full Rate Production Decision Review? [29c (2). Identify the primary Test and Evaluation (T&E) products required at each acquisition milestone.] DOT&E Report on Initial Operational Test and Evaluation (IOT&E) Live Fire T&E Waiver LRIP Article Quantities Approval Early Operational Assessment 3) Sources of risk include: [4e. Use the risk management process to identify the major areas/sources of risk in an acquisition program strategy.] All of the answers are correct Schedul e Productio n Desig n CSCI 202 2A Final Community College of Philadelphia Accessed :N] Multidisciplinary teamwork Intensive micromanagement Calendar-driven scheduling Confidentiality and preserving secrets 5) Barriers to successful implementation of Integrated Product and Process Development (IPPD) include the following (Select all that apply): [Identify the barriers to successful Integrated Product Team (IPT) implementation.] Empowered, qualified team members Open discussions with no secrets Poorly run meetings or reviews Need for significant cultural change Contractor uses IPPD / DoD does not 6) A TEMP (either initial or updated, as appropriate) must be provided for consideration and approval before each milestone review, starting with Milestone B. [Identify the key Operational Test & Evaluation (OT&E) activities that must be coordinated with the Director, Operational Test & Evaluation (DOT&E) staff and the Operational Test Agencies (OTAs).]
Written for
- Institution
- CSCI 202 2A
- Course
- CSCI 202 2A
Document information
- Uploaded on
- January 6, 2024
- Number of pages
- 69
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
- csci 202 2a
- csci
- latest update 2024
- verified answers
- graded
-
csci 202 2a final exam questions and answers