U1 UST Installation/Retrofitting (100% correct answers)
1. One of the significant causes of leaks in underground liquid storage systems is ____________ ________________ correct answers Improper Installation 2. Written Plans are required to correct answers obtain permits, solicit bids, and provide precise guidance for installers. 3. The plans should correct answers Describe the property, identify the size and location of the tanks, indicate the liquids to be stored and provide the location of the dispensers and piping. 4. Storage systems discussed in this recommended practice are usually regulated by correct answers Federal, state or local agencies. 5. All owners should ensure that the equipment to be installed meets correct answers applicable regulatory requirements before being installed 6. Consult the local authorities who have jurisdiction in the area before storage-system plans are correct answers finalized or construction is initiated. 7. All owners should ensure that the equipment to be installed meets all applicable regulatory requirements before correct answers Being installed. 8. To avoid damage tanks must not be correct answers dropped, dragged, or handled with sharp objects. 9. Tanks must not be dropped, dragged, or handled with sharp objects to avoid correct answers Damage to the tank 10. The only time tanks really should be moved is when correct answers for inspections and testing. 11. If a tanks is damaged at all throughout the moving process it must be correct answers Repaired in accordance with the manufacture's instructions. 12. The proper way to move a tank is by lifting it, using the correct answers Lift lugs that are installed by the manufacturer. 13. Tanks should be carefully lifted and lowered using correct answers Cables or chains of adequate length. 14. When two lifting lugs are being used, the angle between the lifting cable and vertical should be no more than correct answers 30 degrees. 15. Stockpile piping materials and equipment in a _____________ _________ on the job site correct answers Secure area
Written for
- Institution
- U1 UST Installation/Retrofitting
- Course
- U1 UST Installation/Retrofitting
Document information
- Uploaded on
- January 7, 2024
- Number of pages
- 15
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
1 one of the significant causes of leaks in under
Also available in package deal