100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
PMT 0170 Risk Management 2024 with 26 Verified Questions and Answers/Latest Update $7.99   Add to cart

Exam (elaborations)

PMT 0170 Risk Management 2024 with 26 Verified Questions and Answers/Latest Update

 0 view  0 purchase
  • Course
  • Institution

PMT 0170 Risk Management 2024 with 26 Verified Questions and Answers/Latest Update

Preview 1 out of 3  pages

  • January 7, 2024
  • 3
  • 2023/2024
  • Exam (elaborations)
  • Questions & answers
avatar-seller
PMT 0170 Risk Management 2024
with 26 Verified Questions and
Answers/Latest Update
Why are Monte Carlo simulations used in program schedule analysis? 10.2 - -To
find the cumulative effect of multiple risks on total project schedule duration or
total project cost

-A shortage of steel has caused a delay in one of the tasks until the material is
available. The original plan estimated the material to be available in 6 weeks, but
the shortage continues. What would be an appropriate step in tracking and
managing this issue? 15.3 - -Adjust the corrective action plan and issue level as
warranted.

-Since risks should be closely tied to individual tasks and deliverables, which of
the following should be used as a cross-reference to each risk? 31.1 - -Work
Breakdown Structure (WBS) number

-The following describes which type of category of risk: Two legacy software
systems must be combined into one system in order to operate a new piece of
hardware. Programmers must find a way to ensure that old data records in each
system are still editable. If not, the hardware will not operate correctly. 7.2 - -
Technical

-Which of the following is important for good government/contractor
coordination of risk management (RM)? (Select two that apply.) 6.3 - -Not:
Common approaches to addressing risk.
All personnel committing to plan and execute a successful risk management (RM)
program

-Which of the following is a critical success factor to ensure effective risk
management (RM)? 4.1 - -Program Risk Process (PRP) Document

-Which stage of the issue management (IM) process is characterized by the
following scenario: It has been observed that the battery used in the new portable
Doppler-based wind measuring system doesn't maintain a charge for long periods
of time. After some study, it is determined that the issue has only a moderate effect
on the program's success. 15.1 - -Not: Issue identification

-Which of the following is a step of the Department of Defense (DoD) Risk
Management Process? 3.1 - -Mitigation

-Which of the following are risk process planning objectives? (Select three that
apply.) 6.1 - -Identifies the plan for training Integrated Product Team (IPT)
members in RM techniques
Ensures sound risk management (RM) principles, tools, and techniques are
applied to the risk management program

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller Nurselucy2023. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $7.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

79064 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$7.99
  • (0)
  Add to cart