Exam (elaborations)
Section 4: Quiz 40 - Business Continuity Plan Question and Answers with 100% Verification
- Course
- Institution
A BCP test that simulates a system crash and is performed on different aspects of the plan in a cost-effective manner is: A. a full operational test B. a paper test C. a walkthrough test D. a preparedness test - ANSWER-Answer: D. A preparedness test. Explanation: In a preparedness test, b...
[Show more]