PJM Generation Dispatcher Sample Exam Questions with 100% Correct Answers | Verified | Latest Update 2024 | 100% pass
PJM Generation Dispatcher Sample Exam Questions with 100% Correct Answers | Verified | Latest Update 2024 | 100% pass Real time transmission constraints or contingencies may be alleviated with generators operating : A. below 60 hertz B. on a new price curve C. on a new cost curve D. off cost ( out of merit) - D. off cost ( out of merit ) Monitoring LMP may give insights into : A. system constraints B. system voltage C. system frefuency D. time error - A. system constraints PJM calls for which of the following to recover the ACE so that tie line schedules are maintained ? A. IRC ( instantaneous reserve check ) B. synchronized Reserves C. supplemential reserves D. minimun generation calculation - B. synchronized Reserves If not cancelled by PJM , the minimum generation alert expires : A. at the end of the specified light load period B. when notified by NERC C. 12 hours after the alert was issued D. after a 24 hour period - A. at the end of the specified light load period When PJM declares a hot weather alert , the generation dispatcher should 1. determine if maintenance can be deferred 2. notift transmission operators 3. notify all generating stations and key personnel 4. direct all generating stations to reduce output A. 1 and 2 only B. 1 and 3 only C. 2
Written for
- Institution
- PJM
- Course
- PJM
Document information
- Uploaded on
- February 18, 2024
- Number of pages
- 19
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
pjm generation dispatcher sample exam
Also available in package deal