Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

SWM DEQ Questions and Answers with complete

Rating
-
Sold
-
Pages
10
Grade
A+
Uploaded on
26-02-2024
Written in
2023/2024

The Virginia Stormwater Management Program is authorized by the ______ and administered through the ______ - Answer-Virginia Stormwater Management Act, Virginia Stormwater Management Program Regulation VPDES Permit/Construction GP authorizes discharge of stormwater from construction activities that are - Answer-greater than or equal to an acre The Stormwater Management Act requires the State Water Control Board to - Answer-permit, regulate, and control stormwater runoff DEQ has ___ days to complete review of real or potential inter-jurisdictional impacts upon request - Answer-90 The Stormwater Management Act requires the following individuals to obtain and maintain a certificate of competency - Answer-staff of a stormwater program, anyone contracted by a VSMP authority, standard and specification holders The dual certificate will expire three years from - Answer-the latest date of the certificates SWM plan must be approved by ___ before land disturbance - Answer-VSMP program authority The water quality criteria sets a site-based load limit of ____ of total phosphorus for new development - Answer-0.41 lbs/acre/year The phosphorus load limit uses the - Answer-10% impervious cover Part II B and II C water quantity criteria addresses - Answer-channel protection and flood protection Which two plans in the SWPPP must be approved? - Answer-SWM plan, ESC plan Does the SWM plan address runoff during or after construction? - Answer-post-constructionWhat is the lower limit of the range of imperviousness that can result in stream degradation? - Answer-10% What do land disturbing activities consist of? - Answer-excavating, clearing, grading LDA threshold for the SWM Act and Regulation - Answer-1 acre or 2500 square feet for Chesapeake Bay Preservation Act In situations where an initial exemption was applicable because LDAs were related to emergency work, VSMP authority shall be advised of the disturbance within - Answer-7 days of commencing the LDA and shall submit a permit application within 30 days of starting the land-disturbing activity Localities with MS4 - Answer-must adopt and administer a stormwater program Localities without MS4 - Answer-may choose to administer a VSMP or have DEQ administer the program DEQ is responsible for enforcing the ____ while locality ____ are responsible for enforcing local ordinances - Answer-Construction GP, VSMP A locality VSMP authority must include enforcement authority and a schedule of civil penalties for enforcement actions in its local ordinance. The maximum penalty the authority may issue is - Answer-$32,500 per violation per day Any civil penalty assessed by a court as a result of a summons issued by a locality VSMP authority must be paid - Answer-into the locality's treasury Any person who violates..... shall be subject to a civil penalty not to exceed - Answer-$32, 500 Chesapeake Bay Preservation Areas that result in a land disturbance greater than or equal to ____ and less than ____ - Answer-2,500 ft^2, 1 acre CBPA LDAs must have - Answer-approved E&SC plan, approved SWM plan, local approval to start land disturbance, long-term maintenance agreement, construction record drawings

Show more Read less
Institution
SWM DEQ
Course
SWM DEQ









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
SWM DEQ
Course
SWM DEQ

Document information

Uploaded on
February 26, 2024
Number of pages
10
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$8.49
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Brainarium Delaware State University
View profile
Follow You need to be logged in order to follow users or courses
Sold
1896
Member since
2 year
Number of followers
1044
Documents
22860
Last sold
6 hours ago

3.8

326 reviews

5
151
4
62
3
55
2
16
1
42

Trending documents

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions