DBIA Project Delivery Exam Questions with Solutions
1 view 0 purchase
Course
NU1426
Institution
NU1426
DBIA - Project Delivery Exam Questions with Solutions.
true
true
true
true
owner
all of the above
All of the above
True
true
The comprehensive process of assigning the contractual responsibilities for designing and constructing a project
Lump Sum
True
true
true
true
Schematic desig...
DBIA - Project Delivery Exam Questions with
Solutions.
1). True
Ans: The correct answer is the general attribute for Design-Build is Single Source
Delivery.
2). True
Ans: Some of the essential concepts of Design-Build are Single Point of
Responsibility, Design process, Design-Cost Relationship, and contract controls
3). True
Ans: Design factors include, but are not limited to, level of design in the RFP, Shifting
Risk, Design Management, and the person controlling the details of the design
4). True
Ans: The 4 design phases in construction are Programming, Schematic Design,
Design Development, and procurement of the Construction Documents
5). Owner
Ans: When the documents are 100% complete, who owns the most amount of risk?
6). All of the above
Ans: What are some of the factors that can influence people's decision to trust?
History/Experience
Competence/Ability Similarities & Differences Relative Power or Authority
7). D
PaperStoc.com Page 1 of 19
, Ans: 1. What project delivery method is it when the designer, contractor and owner
sign one multi party contract?
A) Design Bid Build B) CM at Risk C) Design Build D) Integrated project delivery
8). C
Ans: How many components of total construction costs are there? A) 1B)2C)3D)4
9). A
Ans: What is the typical reimbursement used with Design-Bid-Build?
A) Lump sum B) GMP C) Target price
10). All of the above
Ans: The five phases of the construction process are what? Mark all that apply.
A) real estate B) Financing C) Design D) construction E) Occupancy
11). C
Ans: Under agency CM, construction phase services typically begin once the
__________.
A) The BID is submitted B) the plan and specs are finished C) the pre-construction phase
is completed
12). A
Ans: When there is overlap between two or more phases. B) When the project is
ahead of
schedule C) Hiring more workers to complete project faster.
13). A
Ans: In the design-bid-build method of project delivery, who assumes the risk of
defects in the contract documents?
A) Owner B) Architect C) Contractor D) project manager
14). True
Ans: There are always 3 basic parties involved in the process delivery process.
PaperStoc.com Page 2 of 19
, 15). True
Ans: the procurement/selection process for CM at-risk is more complex than in the
Design-bid- build delivery method.
16). C
Ans: Like design build ___________ facilitates the ability to fast track a project. A) GMP
B) BID BUILD C) CM at Risk
17). The comprehensive process of assigning the contractual responsibilities for designing and
constructing a project
Ans: How would you best describe project delivery?
18). Lump sum
Ans: What type of reimbursement is most common for projects procured with a low
bid or best value: total cost selection?
19). True
Ans: By definition, procurement of the design-bid-build delivery method is only by low
bid or best value: total cost.
20). True
Ans: The agent CM is responsible for furnishing the management services necessary
to deliver construction, not the overall construction of the building.
21). True
Ans: The correct answer is that a project on the fast track when two phases are
overlapped such as design and construction.
22). True
Ans: There are normally three phases in the design process; 1) Schematic documents
phase 2) Design documents phase 3) construction documents phase
23). Schematic design
PaperStoc.com Page 3 of 19
The benefits of buying summaries with Stuvia:
Guaranteed quality through customer reviews
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
Quick and easy check-out
You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.
Focus on what matters
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
Frequently asked questions
What do I get when I buy this document?
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Satisfaction guarantee: how does it work?
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Who am I buying these notes from?
Stuvia is a marketplace, so you are not buying this document from us, but from seller Academik001. Stuvia facilitates payment to the seller.
Will I be stuck with a subscription?
No, you only buy these notes for $12.49. You're not tied to anything after your purchase.