100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
LEAD INSPECTOR / ASSESSOR COURSE $12.99   Add to cart

Exam (elaborations)

LEAD INSPECTOR / ASSESSOR COURSE

 6 views  0 purchase
  • Course
  • LEAD INSPECTOR / ASSESSOR COURSE
  • Institution
  • LEAD INSPECTOR / ASSESSOR COURSE

LEAD INSPECTOR / ASSESSOR COURSE

Preview 3 out of 22  pages

  • March 15, 2024
  • 22
  • 2023/2024
  • Exam (elaborations)
  • Questions & answers
  • LEAD INSPECTOR / ASSESSOR COURSE
  • LEAD INSPECTOR / ASSESSOR COURSE
avatar-seller
Greaterheights
LEAD INSPECTOR / ASSESSOR COURSE
Permanent abatement options include... - Answer- Paint removal, component removal, enclosure, encapsulation
What agencies focus on childhood lead poisoning prevention? - Answer- CDPH, HUD, EPA
What is the CAL OSHA Standard for lead? - Answer- Title 8 CCR 1532.1
What is the Guidelines for the Evaluation and Control of Lead Based Paint Hazards in Housing? - Answer- 1995 HUD Guidelines
When was the revision to Chapter 7 of the Guidelines for the Evaluation and Control of Lead Based Paint Hazards in Housing enacted? - Answer- 1997
Target Housing - Answer- Housing where children may live and spend time in.
T/F Every purchaser of any interest in residential real property on which a residential dwelling was built prior to 1978 is notified that such property may present exposure to lead from lead based paint. - Answer- True
The federal regulation for re-certification occurs how often? - Answer- Every 3 years
In California, how often is re-certification? - Answer- Every other year
What is the California standard equivalent to 29 CFR 1926.62? - Answer- Title 8 CCR 1532.1
What is the California standard equivalent to 29 CFR 1910.134? - Answer- Title 8 CCR 5144
What are the two documents that base the Lead Based Paint Inspections? - Answer- HUD 1995/1997 and EPA 40 CFR part 745
What is EPA 40 CFR part 745? - Answer- Lead; Requirements for Lead Based Paint Activities in Target Housing and Child Occupied Facilities
What is HUD 1995/1997? - Answer- Guidelines for the Evaluation and Control of Lead Based Paint Hazards in Housing
Lead based paint - Answer- paint, varnish, shellac or other coating on surfaces that contain 1.0 mg/cm2 or more of lead or 0.5% or more lead in weight
Lead based paint hazards - Answer- any condition that cause exposure to lead contaminated dust, lead contaminated soil or lead contaminated paint that is deteriorated or present in accessible surfaces, friction surfaces, or impact surfaces that would result in adverse human health effects
Lead based paint inspection - Answer- a surface-by-surface investigation to determine the presence of lead based paint and the provision of a report explaining the results of the investigation
What are the HUD primary substrates? - Answer- brick, concrete, drywall, metal, wood, and plaster
What is the inspector's job during an inspection? - Answer- To test a surface in the interior of each dwelling unit that is representative of each type of painted, stained, shellacked or varnished testing combination in every room equivalent.
T/F Lead inspection includes soil testing. - Answer- False - soil testing is part of a risk assessment or if requested by the owner
Room equivalent - Answer- an identifiable part of a residence, such as a room, house exterior, a foyer, staircase, hallway or an exterior area (play areas, painted swing sets, painted sandboxes, fences, etc.)
Building component type - Answer- those items in the interior or exterior of housing onto
which paint, stain, varnish or shellac has been applied and that have a common substrate
Substrate - Answer- the material underneath the paint
Testing combination - Answer- unique combination of room equivalent, building component type and substrate
Deteriorated paint - Answer- any interior or exterior paint that is peeling, chipping, chalking, cracking or is located on an interior or exterior surface or fixture that is damaged or deteriorated
Accessible surface - Answer- surface that protrudes from the surrounding area to the extent that a child can chew the surface and is within three feet of the floor or ground (e.g. window wills, railing and the edges of stair treads)
Multi-family housing (for the purposes of a lead based paint inspection only) - Answer- Any group of units that is similar in construction from unit to unit with 1) 21 or more units
if any were built before 1960 or are of unknown age or 2) 10 or more units if they were built from 1960 - 1977
Permanent Abatement and work over PEL - YES
Abatement Planning - NO
Hazard Evaluation - NO Clearance Inspections - NO - Answer- Certified Lead Worker
Permanent Abatement and work over PEL - YES
Abatement Planning - YES
Hazard Evaluation - NO
Clearance Inspections - NO - Answer- Certified Lead Supervisor
Permanent Abatement and work over PEL - NO
Abatement Planning - YES
Hazard Evaluation - NO
Clearance Inspections - YES - Answer- Certified Lead Project Monitor
Permanent Abatement and work over PEL - NO
Abatement Planning - NO
Hazard Evaluation - YES
Clearance Inspections - YES - Answer- Certified Lead Inspector / Assessor and Certified Sampling Tech (under the supervision of an inspector/assessor)
Lead has been used in paint for what three main reasons? - Answer- as pigment, to add
durability and corrosion control, and as a drying agent
What is the greatest risk of lead exposure that people face? - Answer- Man-made processes and products
Currently, what is the principal industrial use of lead? - Answer- Manufacture of electrical storage batteries
Where does the major exposure to lead for most adults come from? - Answer- The work
place
What are the major sources of lead exposure for infants and young children? - Answer- Surface dust and soil contaminated with lead
T/F A person may become poisoned through exposure to a single high-level source of lead or through the cumulative effect of repeated exposures to low-level sources of lead. - Answer- True
What is the main cause of lead contamination in drinking water? - Answer- Corrosion of lead-containing materials in household plumbing
T/F Hot, acidic, 'soft' (low in dissolved solids) water is the least corrosive towards lead; cold, alkaline, 'hard' water is most corrosive. - Answer- False
In what year did Congress ban the use of lead-containing materials above specific percentages in public water supply systems and in any plumbing providing drinking water connected to public water systems? - Answer- 1986

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller Greaterheights. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $12.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

79271 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$12.99
  • (0)
  Add to cart