Exam (elaborations)
Concrete Batch Plant Operator Exam (FDOT) -with 100% verified solutions-2023/2024
- Course
- BUSINESS 330
- Institution
- West Coast University
Stockpiles of aggregate shall be maintained in a well-drained condi7on in order to: Minimize Free Water Content Coarse aggregate stockpiles must be sprinkled for at lest how many hours prior to batch for FDOT? 24 Free moisture of the aggregate means: Moister on the surface of an aggregate tha...
[Show more]