BECC Mod 3 REVIEW TEST GUIDE QUESTIONS 2024.
BECC Mod 3 REVIEW TEST GUIDE QUESTIONS 2024. What are the 3 conditions of readiness levels? - correct answer X-ray, Yoke, Zebra When is material condition x-ray set? - correct answer When the ship is in almost no danger of attack or natural hazard How are X-Ray closure and fittings labeled? - correct answer Black letter X What must you do prior to opening fittings? - correct answer Permission must be obtained and fitting must be logged open in the DC Closure log True or False: During material condition X-Ray, the fire main is operated as a single system? - correct answer True True or False: During material condition X-ray, all valves and fittings marked X are closed and all other valves and fittings remain open? - correct answer True When is material condition Yoke set? - correct answer While at sea When is material condition Yoke set while in-port? - correct answer Outside of regular working hours and while entering and leaving port What fittings are closed during material condition Yoke? - correct answer All X-Ray and Yoke fittings Do you have to request permission to open Yoke fittings? - correct answer Yes
Written for
- Institution
- BECC
- Course
- BECC
Document information
- Uploaded on
- March 19, 2024
- Number of pages
- 11
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
- becc mod 3
-
becc mod 3 review test guide questions 2024
Also available in package deal