100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
ACQ 101 module 6 Work Breakdown Structure WBS Questions and Answers Rated A+ $8.49   Add to cart

Exam (elaborations)

ACQ 101 module 6 Work Breakdown Structure WBS Questions and Answers Rated A+

 5 views  0 purchase
  • Course
  • ACQ 101 module 6
  • Institution
  • ACQ 101 Module 6

The DoD provides guidance for the development of a standardized WBS. The principal document that describes these structures is derived from which of the following? MIL-STD881C The principal document that the DoD employs in developing and standardizing WBS is the "DoD standard practice work br...

[Show more]

Preview 2 out of 5  pages

  • April 4, 2024
  • 5
  • 2023/2024
  • Exam (elaborations)
  • Questions & answers
  • ACQ 101 module 6
  • ACQ 101 module 6
avatar-seller
GONZOGEEK
ACQ 101 module 6 Work Breakdown Structure WBS Questions and Answers Rated A+ DoD components and contractors use WBSs as a foundation to establish schedules and formulating budgets. ✔✔True The DoD provides guidance for the development of a standardized WBS. The principal docu ment that describes these structures is derived from which of the following? ✔✔MIL-STD -
881C The principal document that the DoD employs in developing and standardizing WBS is the "DoD standard practice work breakdown structures for defense materiel items. " In the document, how many types of systems are covered? ✔✔11 eleven What are the common elements of WBSs? ✔✔integration, assembly, test and checkout; systems engineering; program management; training; data; system test and evaluation; peculiar support equipment; common support equipment; operation and site activation; industrial facilities; initial spares and repair parts. Which of the following is referred to as the "product part" of a WBS? ✔✔system elements The common elements of a WBS are elements c ommon to all acquisition programs developed by the DoD. Common elements can be found at all levels of a WBS. They are the actual configuration items of the system, and enable the realization of the system. ✔✔false; common elements can be found at all level s of a WBS. They are the enabler for the system realization. They are applicable to all major systems and subsystems as needed. They are NOT the actual configuration items of the system, but elements that enable the realization of the system. Program WBS is controlled and maintained by? ✔✔program management office PMO Contract WBS is controlled and maintained by? ✔✔the contractor WBS Level 3 elements are subordinate elements of each Level 2 major element. Which of the following are identified as level 3 elements? ✔✔fire control type of service; technical publication The Program WBS has 3 levels; what are they and what do they cover? ✔✔Level 1 is the entire aircraft system; Level 2 covers the prime mission products including the aircraft system hardware a nd software and includes the aggregations of system -level services such as program

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller GONZOGEEK. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $8.49. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

67866 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$8.49
  • (0)
  Add to cart