Exam (elaborations)
Tower Crane Exam set 3 Questions with Correct Answers
- Course
- Institution
A. by gradually increasing and decreasing speed Correct Answer How must tower crane movements be performed? A. by gradually increasing and decreasing speed B. as quick as the job dictates C. as slow as the job dictates D. at the speed designated by the site supervisor A. to limit side loadi...
[Show more]