1. UL 1741 - ANS Standards for inverters, converters, controller and
interconnections
2. UL 1703 - ANS Standard for safety, flute plate, Pave modules and panels
3. What PV panels are made from cylindrical silicon ingot - ANS
MONOCRYSTALLINE?
4. Residential Pave systems are limited to no more than 24 two-volt cells connected
in series - ANS 48V in total per NEC 690.71
5. Roof mounted systems are mounted on aluminum or stainless steel rail secured
into the roof trusses using - ANS Lag Bolts
6. Diagnosing a PV problem - ANS Stay safe, look at system first, turn things off
with disconnects, then take measurements
7. PV monitoring systems - ANS consists of a device that measures current and
voltage on ac output of the inviter
8. PV source circuits meets PV output circuits - ANS in the combiner box
9. The point on the IV curve where the MPPT is maximum - ANS is at the third point
10. Current is measured with - ANS millimeter with a clamp
11. ARC flashes inverters are equipped with - ANS arc fault detection
12. NEC - ANS contains which wire to use
13. OSHA - ANS Federal agency that establishes and enforces standards of safety
for the workplace
14. A restaurant uses 2200WH, 48 V dc, 4.9 PSH, and a Battery efficiency of 90%,
what is the Ah capacity needed? - ANS 2200WH/48V = 45.83 AH 45.83AH/.90 =
50.92 50.92/4.9 = 10.39
15. A restaurant uses 2WH and has 10 kWh in storage what can them operation? -
ANS They can operate all operations for days. 10 kWh is a lot of capacity
compared to your usage of 2 WH. First convert 10 kWh to 10,000 Who which is a
lot compared to 2 wh. Refer to section 7.4.0 of your NCCER book for more detail.
16. When you lock out a system you need to use - ANS engraving
17. What was a non-producing financial incentive for installing pave - ANS
REBATES?
18. PV system warranties are for - ANS 25 years
19. What amps would cause an installer if shocked not be able to let go - ANS over
10MA
, 2
22. What needs to be done to PV modules to prevent them from energizing and
causing shock - ANS they need be covered and the leads plugged together
23. Inverters use a digital display to indicate - ANS ambient temperature and voltage
output
24. Ground fault protection - ANS is located in the inverter
25. STC - ANS air mass of less than 1.5 spectral distribution
26. What point on curve has the most MPPT on IV curve - ANS the third point in the
graph?
27. Digital meter with clamp - ANS Ammeter
28. What is the benefit of putting modules on the ground instead of the roof - ANS
they are cooler
29. What is the maintenance required to do on the roof through the life of the system
- ANS replace brackets
30. You need what type of tools to prevent shock - ANS insulated tools
31. Items used for combining the output of grid tied battery inverter - ANS dc
disconnected between array and inverter
32. Diversion charge controller - ANS diverts electricity from fully charged batters to
load
33. Which information is covered in the scope of NEC - ANS national electrical code?
34. In a grid connected system PV array ground fault protection is normally included
as part of the - ANS interactive inverters
35. Which calculation is used to determine the overcurrent protection device installed
in a PV source circuit - ANS ISCx1.25
36. DC disconnect is required - ANS between the array and the inverter
37. AC disconnect is required - ANS between the inverter and the building service
panel
38. Which electrical agency has general authority over PV installation - ANS CITY?
39. To prevent arcing what is the most important measurement to take before
opening a module output connector - ANS voltage
40. Which is a direct effect of using dissimilar metals in a PV racking system - ANS
galvanic corrosion
41. Which of the following is most likely a maintenance item for a PV system in the
first five year following installation - ANS wash pollen or dust off module
42. Which piece of equipment should be installed between a string inverter installed
The benefits of buying summaries with Stuvia:
Guaranteed quality through customer reviews
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
Quick and easy check-out
You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.
Focus on what matters
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
Frequently asked questions
What do I get when I buy this document?
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Satisfaction guarantee: how does it work?
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Who am I buying these notes from?
Stuvia is a marketplace, so you are not buying this document from us, but from seller Pronurse. Stuvia facilitates payment to the seller.
Will I be stuck with a subscription?
No, you only buy these notes for $17.99. You're not tied to anything after your purchase.