100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
IMSA TRAFFIC SIGNAL TECHNICIAN LEVEL 1 PRACTICE EXAM ALL QUESTIONS AND CORRECT ANSWERS/ VERIFIED AND MOST RECENT EDITION 2024/2025 GRADED A+ BRAND NEW!!!! $22.99   Add to cart

Exam (elaborations)

IMSA TRAFFIC SIGNAL TECHNICIAN LEVEL 1 PRACTICE EXAM ALL QUESTIONS AND CORRECT ANSWERS/ VERIFIED AND MOST RECENT EDITION 2024/2025 GRADED A+ BRAND NEW!!!!

1 review
 6 views  0 purchase
  • Course
  • IMSA TRAFFIC SIGNAL TECHNICIAN LEVEL 1
  • Institution
  • IMSA TRAFFIC SIGNAL TECHNICIAN LEVEL 1

IMSA TRAFFIC SIGNAL TECHNICIAN LEVEL 1 PRACTICE EXAM ALL QUESTIONS AND CORRECT ANSWERS/ VERIFIED AND MOST RECENT EDITION 2024/2025 GRADED A+ BRAND NEW!!!!

Preview 3 out of 16  pages

  • April 27, 2024
  • 16
  • 2023/2024
  • Exam (elaborations)
  • Questions & answers
  • imsa
  • IMSA TRAFFIC SIGNAL TECHNICIAN LEVEL 1
  • IMSA TRAFFIC SIGNAL TECHNICIAN LEVEL 1

1  review

review-writer-avatar

By: kerrydanns • 5 months ago

avatar-seller
NURSELINCON
1 | P a g e IMSA TRAFFIC SIGNAL TECHNICIAN LEVEL 1 PRACTICE EXAM ALL QUESTIO NS AND CORRECT ANSWERS/ VERIFIED AND MOST RECENT EDITION 2024/2025 GRADED A+ BRAND NEW!!!! What is the primary function of the IMAS? - ANSWER: Safety Education IMSA Stands for - ANSWER: International Municipal Signal Association The advanced transportation controller was developed to provide: - ANSWER: Open architecture hardware and software platform Which of the following type of controller assemblies, without adapters, can accept multiple software platf orms and be utilized in all types fo cabinets: - ANSWER: 2070 controller What is another term for load switches used in 170/2070 controllers? - ANSWER: switch packs Which type of controller was introduced to supersede the 170 controller? - ANSWER: 2070 control ler the NEMA TS -2 standards cover the same items as the TS -1 standards but expand the requirements to include which of the following: - ANSWER: Treatment fo signal preemption What is NOT part of an underground power service: - ANSWER: Conduit rise with weath erhead 2 | P a g e Two common types of signal pole installations are - ANSWER: Direct buried and foundation The first type of testing performed on a controller cabinet assembly is - ANSWER: bench test Which of the following is NOT an IMSA certification? - ANSWER: Traffic Signal Level III Bridge Technician Which of the following are potential safety hazards? - ANSWER : overhead and underground power, gas, aerial lift equipment. Tra What are the sections of a ramp mete signal - ANSWER: Circular red, circular green PPE stands for - ANSWER: Personal Protective Equipment A work zone supervisor is responsible for which of the following tasks: - ANSWER: Ensure advance warning devices have not been removed or relocated . Which of the following is NOT a sentence type in the MUTCD? Standards; requirement that have to be followed. Guidance; recommendations that are to be followed unless there I good reason not to. Objectives; reasons behind the standards and guidance. Supp ort; additional information to clarify the standards and guidance. - ANSWER: Objectives; reasons behind the standards and guidance 3 | P a g e Which of the following is an example configuration fo an Emergency - Vehicle Traffic Control Signals? - ANSWER: Thee section tra ffic signal with circular red, circular yellow, and smaller circular yellow indications. The following phases are typically assigned to the major -street through movements: - ANSWER: 2 and 6 There green interval is made up of which three components? - ANSWER: Minimum green, passage time, maximum green What are the three typical types of recall features of a traffic signal controller? - ANSWER: Minimum, Maximum, Pedestrian In a coordination plan, what is the number of seconds given to each phase at the intersec tion? - ANSWER: split which of the following traffic signal coordination methods is typically the least expensive? - ANSWER: Time -Based Coordination Which of the following is a definition for cycle length? - ANSWER: The elapsed time between the start of a spec ific display until that display comes up again. Which of the following is a characteristic of sequential phases? - ANSWER: they cannot occur at the same time. Which of th following is a definition for initial green time - ANSWER: Minimum time that that the green indication myst be displayed

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller NURSELINCON. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $22.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

75632 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$22.99
  • (1)
  Add to cart