Advance Rigger Test Exam with Correct Answers
Advance Rigger Test Exam with Correct Answers What is meant by the term "two blocking"? a. Placing blocks under the outrigger beams. b. The load block contacts the boom point sheaves. c. Stacking loads on top of one another. d. The load strikes the boom while swinging. - CORRECT ANSWERS-b. The load block contacts the boom point sheaves. Lifting 20,000 lbs with a 2-leg bridle sling at a 30° horizontal sling angle, what is the force applied to each leg? a. 10,000 pounds b. 20,000 pounds c. 30,000 pounds d. 40,000 pounds - CORRECT ANSWERS-b. 20,000 pounds In multiple crane lifts using an equalizer beam, the weight of the beam should be considered: a. Part of the crane boom b. Part of the load weight c. Part of the crane weight d. A non-factor - CORRECT ANSWERS-b. Part of the load weight What is required if there is a deviation from the lift plan? a. The supervisor's permission b. The rigger's permission c. A new lift plan d. Mark ups on the existing lift plan - CORRECT ANSWERS-c. A new lift plan On level ground using skids and rollers, what percent of the weight of the load should yield the required line pull as a general rule of thumb? a. 2% b. 5% c. 10% d. 20% - CORRECT ANSWERS-b. 5% All of the following are results of unbalanced reeving of the hook block EXCEPT: a. Wear on the sheaves b. Torque on the boom c. Wear on the hook d. Wear on the wire rope - CORRECT ANSWERS-c. Wear on the hook Before a spreader bar or beams can be used they MUST have been: a. Repainted b. Used before c. Tested and approved d. Upgraded from the previous job - CORRECT ANSWERS-c. Tested and approved When materials are being hoisted to an upper level, a tag line is used to: a. Help raise the load b. Help control the load c. Stop the process d. Stop material from falling - CORRECT ANSWERS-b. Help control the load Two cranes are lifting 100 tons. If crane A has 40% of the load, how much weight will crane B have on its hook? a. 60,000 lbs b. 80,000 lbs c. 120,000 lbs d. 240,000 lbs - CORRECT ANSWERS-a. 60,000 lbs To CONFIRM the rated capacity of a specific sling, consult the ma
Written for
- Institution
- Ncccer advance rigger
- Course
- Ncccer advance rigger
Document information
- Uploaded on
- April 29, 2024
- Number of pages
- 10
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
- according to
-
advance rigger test exam with correct answers
-
what is meant by the term two blocking
-
all of the following are results of unbalanced ree
-
when using a 1 inch wire rope sling in a vertical
Also available in package deal