100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
NICET LEVEL 1 HIGHWAY CONSTRUCTION Exam Questions and Answers (Latest Update 2023) Verified Answers $15.49   Add to cart

Exam (elaborations)

NICET LEVEL 1 HIGHWAY CONSTRUCTION Exam Questions and Answers (Latest Update 2023) Verified Answers

 2 views  0 purchase
  • Course
  • NICET .
  • Institution
  • NICET .

NICET LEVEL 1 HIGHWAY CONSTRUCTION Exam Questions and Answers (Latest Update 2023) Verified Answers

Preview 2 out of 7  pages

  • May 4, 2024
  • 7
  • 2023/2024
  • Exam (elaborations)
  • Questions & answers
  • nicet level 1
  • NICET .
  • NICET .
avatar-seller
Ressy
NICET LEVEL 1 HIGHWAY CONSTRUCTION Exam Questions and Answers (Latest Update 2024) Verified Answers The written acceptance by the Department of the Work. - ANSWER ✅✅ Acceptance Testing conducted by the Department to measure the degree of compliance to the Contract - ANSWER ✅✅ acceptance testing The computed cost using calculations provided - ANSWER ✅✅ actual cost A Contr act revision or response to a Contractor inquiry issued after advertisement and before the opening of bids. - ANSWER ✅✅ addendum The quantity of a completed Item eligible for payment - ANSWER ✅✅ as-built quantity The amount of funds authorized by the Departmen t for the Contract - ANSWER ✅✅ authorized funding amount The individual, firm, partnership, corporation, joint venture, or any acceptable combination thereof that submits a bid to the Department. - ANSWER ✅✅ Bidder . A structure, other than a culvert, includin g supports, erected over a depression or an obstruction, such as water, highway, or railway, and having a track or passageway for carrying traffic or other moving loads and having a length 3 measured along the center of the structure of more than 20 feet b etween undercopings of abutments or extreme ends of openings for multiple boxes. Structure dimensions are defined as follows: - ANSWER ✅✅ bridge The overall length measured along the line of survey stationing from back to back of backwalls of abutments, if p resent, otherwise end to end of the bridge floor; but, in no case less than the total clear opening of the structure - ANSWER ✅✅ bridge length The clear width measured at right angles to the longitudinal centerline of the bridge between the bottom of curbs, or in the case of multiple height of curbs, between the bottoms of the lower risers or, if curbs are not used, between inner faces of parapet or railing - ANSWER ✅✅ bridge width A written order issued by the Department to the Contractor after execution of th e Contract authorizing one or more of the following: 1. Changes in the Work. 2. Modifications in the basis of payment. 3. Modifications to Contract Time. - ANSWER ✅✅ Change Order. Occurrences in which the subcontractor is responsible for the execution of a distinct element of the work of a contract and carrying out its responsibilities by actually performing, managing, and supervising the work involved, and with respect to materials and supplies used on the contract, prepares the estimate, negotiates price, determines quality and quantity, orders the material, arranges delivery, installs (where applicable), and pays for the material and supplies itself for the project. - ANSWER ✅✅ Comm ercially Useful Function When all of the following have occurred: 1. The Work has been satisfactorily completed in all respects according to the Contract. 2. The Project is ready for use by the Department as required by the Contract. 3. The Contractor has satisfactorily executed and delivered to the RE all documents, certificates, and proofs of compliance required by the Contract including the Notice of Completion. - ANSWER ✅✅ Completion Physical work done in the performance of the Contract within the Project Limits. Does not include off -site mobilization, procurement and off -site storage of materials and plants, engineering, performance bond and payment bond, surveys, working drawings, off-site field offices, schedules, certificates, forms, or documents - ANSWER✅✅ construction operations The written integrated agreement between the Department and the Contractor setting forth the obligations of the parties, including, but not limited to, the performance of the Work and the basis of payment. It includes the adver tisement, Proposal, Certification as to Publication and Notice of Advertisement for Proposal, bid, Appointment of Agent by Nonresident Contractors, Resolution of Award of Contract, Executed Form of Contract, performance and payment bonds, Specifications, P lans, Right -of-Way Plans, permits, boring logs, pavement core records, addenda, Change Orders, and Field Orders, all of which are to be treated as one instrument whether or not set forth at length in the form of it. - ANSWER ✅✅ Contract The number of working days allowed to complete the work for a milestone or the date by which work must be completed, as provided in the Contract and as modified by Change Order. - ANSWER ✅✅ Contract Time The individual, firm, partnership, corporation, joint venture, or any accep table combination thereof contracting with the Department for performance of the Contract. For the purpose of carrying out the Contract, it also means the Contractor's representative. - ANSWER ✅✅ Contractor Every day shown on the calendar - ANSWER ✅✅ day. The Department of Transportation of the State of New Jersey, as created by law, acting through duly authorized representatives, such representatives acting within the scope of the particular duties delegated to them. - ANSWER ✅✅ Department

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller Ressy. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $15.49. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

62890 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$15.49
  • (0)
  Add to cart