The pre-hot work check must be conducted by the responsible person... : Once per day Roofing operations should have a _______ fire extinguisher within _______ feet from where the hot-work is performed and where the fire guards are positioned. : 3-A:40-B:C, 30 Piped gas lines should be... : S...