100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
ACI Concrete Exam Questions And Answers Graded A+ $11.99   Add to cart

Exam (elaborations)

ACI Concrete Exam Questions And Answers Graded A+

 3 views  0 purchase
  • Course
  • Institution

ACI Concrete Exam Questions And Answers Graded A+ What must be done if the concrete drops below the top of the Slump mold while the top layer is being rodded? Add additional concrete to keep an excess of concrete above the top of the mold at all times Rod each layer ___ times uniformly over ...

[Show more]

Preview 2 out of 15  pages

  • May 10, 2024
  • 15
  • 2023/2024
  • Exam (elaborations)
  • Questions & answers
avatar-seller
ACI Concrete Exam Questions And Answers
Graded A+
What must be done if the concrete drops below the top of the Slump mold while the top layer is
being rodded?
Add additional concrete to keep an excess of concrete above the top of the mold at all times


Rod each layer ___ times uniformly over the cross section with the rounded end of the rod.
25


The slump mold is filled in _____ layers.
3 layers


True or false the slump mold should be in a dry condition before beginning the test?
False.


For use in the slump test, the tamping end on both ends of the tamping rod must be...
Rounded to a hemispherical tip


True or false the Anterior surface of the slump mold is allowed to have minor irregularities?
False


The mold for making the slump test is in the shape of
The frustum of a cone


What is the maximum allowable time between obtaining the first and final portion of the composite
samples?
15 minutes


True or false the sample of concrete used for temperature determination must be rodded 25 time?
False


What is the required shape of the tamping end of the tamping rod?
Rounded to a hemispherical tip


Is the measurement for slump is made from the top of the mold to what point of the concrete
specimen?
The displaced original center of the top surface of the specimen.

True or false after the final rodding, the sides of the slump should be tapped lightly with the tamping
rod
False


Prior to lifting the mold, concrete must be removed from _____.
the area surrounding the base

, If rodding is the method of consolidation being used, the measure must be filled in how many layers?
3


For a measure of 14 L [0.5 ft^3], what is the required number of strokes of the tamping rod for
consolidation of each layer?
25


When rodding the middle and top layers, the tamping rod should penetrate into the layer below
approximately how deep
1" or 25mm


The end of the temperature sampling portion of the temperature measuring device is submerged a
minimum of _____ into the freshly a mixed concrete
3"


After the temperature of the concrete is read, what is then required?
Report the temperature


What must be done to the concrete surrounding the temperature measuring device after the device is
submerged in the fresh concrete?
Gently press the concrete around the device to prevent air from impacting the temperature read.


What must be done to the sample container prior to sampling the concrete?
Dampen (with water)


True or false the temperature of concrete may be measured in a wheelbarrow
True


The temperature of the concrete is reported to the nearest
Degree


The direct reading of the final liquid level in the neck of the air meter, Is estimated to the nearest
0.25%


True or false it is necessary to tap the sides of the measuring bowl after each layer has been rodded
True


What must be done if there is a slight deficiency in the quantity of concrete in the measure following
consolidation of the final layer?
Add a small quantity of representative concrete before strike off


What tools may be used to strike off the top surface of the concrete following consolidation of the
final layer?
A strike-off bar; a metal, glass, or acrylic plate

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller LectAziim. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $11.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

81989 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$11.99
  • (0)
  Add to cart