100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
MIS 3320 Final Exam by Baylor Sullivan Review 2024/2025 $10.39   Add to cart

Exam (elaborations)

MIS 3320 Final Exam by Baylor Sullivan Review 2024/2025

 1 view  0 purchase
  • Course
  • Institution

MIS 3320 Final Exam by Baylor Sullivan Review 2024/2025 Select THREE reasons why we need a formal process of analyzing and designing a system. 1. To deliver value as promised 2. To minimize failure 3. To avoid creating an intuition based-system The following option is a stage in the system...

[Show more]

Preview 2 out of 11  pages

  • May 17, 2024
  • 11
  • 2023/2024
  • Exam (elaborations)
  • Questions & answers
avatar-seller
MIS 3320 Final Exam by Baylor Sullivan
Review 2024/2025
Select THREE reasons why we need a formal process of analyzing and designing a system.
1. To deliver value as promised
2. To minimize failure
3. To avoid creating an intuition based-system


The following option is a stage in the system development life cycle EXCEPT...
Coding


Identify opportunity, analyze feasibility, and develop work plans are the activities a system analyst
does during the __________ stage of the system development life-cycle.
Planning


Under what stage of the SDLC does a project team father the requirements for the new system?
Analysis


A system analyst MUST have the following skills EXCEPT...
Judgement Skills


One possible source of an IS project idea is someone in the organization identifies a business needs to
build a system
True


IS project ideas need to be aligned with business strategies. In other words, business needs to drive IT
projects.
True


At what stage of the SDLC does the project team write the actual programming codes needed for the
system?
Implementation


An IS only consists of software and hardware.
False


Technical feasibility:
Assess the team's familiarity with applications and technology

Can we build it?


Economic feasibility:
Perform a cost/benefit analysis

Should we build it?

, Organizational feasibility:
Understand how well the goals of the project align with business objectives

If we build it, will it be useful?


The following option is considered an aspect of technical feasibility EXCEPT:
Cost-benefit analysis

EXAMPLES INCLUDE:
Project size
Familiarity with technology
Familiarity with application
Compatibility


Under what type of feasibility do you conduct a stakeholder analysis?
Organization feasibility


The following examples are considered tangible benefits EXCEPT:
Increased brand recognition

EXAMPLES INCLUDE:
Reductions in staff
Increased sales
Reductions in IT costs


THREE variants of Rapid Application Development discussed in module 3 include:
Iterative model
Throwaway prototyping
System prototyping


Which of the following options is a characteristic of a waterfall approach?
The project team proceeds sequentially from one phase to the next


Waterfall:
The requirements are defined long before the programming begins. This method also emphasizes on
detailed documents


Rapid Application Development
The team begins developing the most critical requirements in the early version of the system


Agile methodology
Focuses on short cycles that produce a complete software product. An example of this methodology is
Scrum.


You are developing a new system. You'd like to focus on the verification and validation of the system
because your goal is to improve the quality of the system by including Quality Assurance expertise
early in the project strengthens system quality. What method do you use in this case?
V-Model

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller EXAMSMART. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $10.39. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

75323 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$10.39
  • (0)
  Add to cart