Exam (elaborations)
IFPC Employment Questions with 100% Correct Answers | Verified | Latest Update 2024
- Course
- Institution
1. SITE PREPERATION:: The C-RAM site must be prepared to receive equipment as soon as possible once the decision to deploy is made. Considerations for site include: The Land-based Phalanx Weapon System minimum emplacement is 50 meters apart. ground should be relatively flat (+-5 degrees). T...
[Show more]