100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
DBIA EXAM 1, EXAM 2 AND EXAM 3 NEWEST 2024 ACTUAL EXAM COMPLETE 500 QUESTIONS AND CORRECT DETAILED ANSWERS (VERIFIED ANSWERS) |ALREADY GRADED A+ $33.48   Add to cart

Exam (elaborations)

DBIA EXAM 1, EXAM 2 AND EXAM 3 NEWEST 2024 ACTUAL EXAM COMPLETE 500 QUESTIONS AND CORRECT DETAILED ANSWERS (VERIFIED ANSWERS) |ALREADY GRADED A+

 7 views  0 purchase
  • Course
  • Institution

DBIA EXAM 1, EXAM 2 AND EXAM 3 NEWEST 2024 ACTUAL EXAM COMPLETE 500 QUESTIONS AND CORRECT DETAILED ANSWERS (VERIFIED ANSWERS) |ALREADY GRADED A+ DBIA EXAM 1, EXAM 2 AND EXAM 3 NEWEST 2024 ACTUAL EXAM COMPLETE 500 QUESTIONS AND CORRECT DETAILED ANSWERS (VERIFIED ANSWERS) |ALREADY GRADED A+

Preview 4 out of 104  pages

  • June 4, 2024
  • 104
  • 2023/2024
  • Exam (elaborations)
  • Questions & answers
avatar-seller
DBIA EXAM 1, EXAM 2 AND EXAM 3 NEWEST 2024
ACTUAL EXAM COMPLETE 500 QUESTIONS AND
CORRECT DETAILED ANSWERS (VERIFIED ANSWERS)
|ALREADY GRADED A+

DBIA EXAM I


In which project delivery method is the construction team brought on
AFTER design, with open bidding? - ANSWER---- DBB


In the planning phase, Influence has a _____ impact on the project. -
ANSWER---high


In which project delivery method is the construction team brought on
EARLY, facilitating fast-tracking? - ANSWER---DB


Spearin Doctrine: Owner hiring designers provides contractors two
specific implied warranties: Plans and specs are _____; Plans and specs
are suitable for _____ _____. - ANSWER---- accurate
- intended purpose


What are the 5 types of project delivery systems? - ANSWER---- DB
- DBB
- CMAR
- IPD
- Multiple prime contracting

, DBIA EXAM 1, EXAM 2 AND EXAM 3 NEWEST 2024
ACTUAL EXAM COMPLETE 500 QUESTIONS AND
CORRECT DETAILED ANSWERS (VERIFIED ANSWERS)
|ALREADY GRADED A+


_____ is a linear sequential process. - ANSWER---DBB


In DBB, the A/E is typically selected on _____ and the GC is typically
selected on _____ _____. - ANSWER---- qualifications
- low price


In DBB, design is fully completed _____ input from the GC. -
ANSWER---without


In _____, the A/E is acting in the owner's interests. - ANSWER---DBB


Who controls the design team selection in DBB? - ANSWER---The
Owner


The _____ project delivery method is well established and understood. -
ANSWER---DBB


Which project delivery system is consistent with public sector
procurement laws and the most prevalent delivery system through the
20th century? - ANSWER---DBB

, DBIA EXAM 1, EXAM 2 AND EXAM 3 NEWEST 2024
ACTUAL EXAM COMPLETE 500 QUESTIONS AND
CORRECT DETAILED ANSWERS (VERIFIED ANSWERS)
|ALREADY GRADED A+

In DBB the _____ _____ is incompatible with expediting project
delivery. - ANSWER---Linear sequence


in _____, the contractor's input is absent during the design process. -
ANSWER---DBB


In DBB, the Owner has a "_____ of _____ relationship" with the A/E. -
ANSWER---Standard of Care Relationship


In DBB, the Owner has a "_____ relationship" with the Contractor. -
ANSWER---Spearing Relationship


What 2 methods of selection (procurement methods) does CMAR use? -
ANSWER---- QBS
- Best Value


Who provides the pre-construction services for CMAR? - ANSWER---
Contractor


What kind of contracting approach is usually used in CMAR? -
ANSWER---Negotiated GMP

, DBIA EXAM 1, EXAM 2 AND EXAM 3 NEWEST 2024
ACTUAL EXAM COMPLETE 500 QUESTIONS AND
CORRECT DETAILED ANSWERS (VERIFIED ANSWERS)
|ALREADY GRADED A+

What is special about the estimating process in CMAR? - ANSWER---it
is an open-book


Which delivery methods have the chance to fast track the schedule? -
ANSWER---- DB
- CMAR


In CMAR, the construction cost is determined _____ the design is
completed. - ANSWER---before


In CMAR, the Owner procures and manages designers and contractors
under (one / two separate) contracts? - ANSWER---two separate


In CMAR, the _____ negotiates the full commercial deal. - ANSWER---
Owner


In CMAR, what is the direct contractual relationship between the
contractor and designer? - ANSWER---There is no direct contractual
relationship


In CMAR, there is _____ public sector authority for its use. -
ANSWER---limited

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller erickarimi. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $33.48. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

67163 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling

Recently viewed by you


$33.48
  • (0)
  Add to cart