100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
CM 1011 3, 4, 5 Questions with 100% Actual correct answers | verified | latest update | Graded A+ | Already Passed | Complete Solution $7.99   Add to cart

Exam (elaborations)

CM 1011 3, 4, 5 Questions with 100% Actual correct answers | verified | latest update | Graded A+ | Already Passed | Complete Solution

 3 views  0 purchase
  • Course
  • Institution

CM 1011 3, 4, 5 Questions with 100% Actual correct answers | verified | latest update | Graded A+ | Already Passed | Complete Solution

Preview 1 out of 2  pages

  • June 26, 2024
  • 2
  • 2023/2024
  • Exam (elaborations)
  • Questions & answers
avatar-seller
CM 1011 3, 4, 5
Which of the following is NOT usually one of the bid documents? - ANS-Technical specifications

The competition criteria used to determine the chosen constructor are - ANS-Price
B.Qualifications

Any selection process in which proposals contain both price and qualitative components and the
award is based upon a combination of price and qualitative considerations is - ANS-Best value

Which type of bond guarantees that the payment for a contractor's labor and materials used on
the project will be made? - ANS-payment bond

D.labor and materials payment bond

Public projects have historically been decided by selection of: - ANS-The lowest responsive bid
in conformance with the bid requirements

The part of a design-build proposal that stipulates the price at which the design-builder will
provide the design and construction services necessary to complete the project is: - ANS-Price
proposal

The low-bid selection method involves bidders obtaining plans and specs for review by: -
ANS-The constructor and prospective sub-contractors

Open bidding is required on public projects because _____? - ANS-they are funded by
taxpayers' dollars

A bid or proposal package that meets all of the requirements of the solicitation instrument is a: -
ANS-Responsive bid

The selection methods used for selecting construction and construction management services -
ANS-A.Low-bid
B.Best-value (BVS)
C.Qualifications-based (QBS)

If missing at the bid opining, which one of the below items is cause to reject the bid? -
ANS-A.Sealed envelope
B.Contractor's license
C.Contractor's name

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller Hkane. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $7.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

81531 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$7.99
  • (0)
  Add to cart