100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
CM 1011 midterm-LSU, CM 1011 Midterm - LSU Questions with 100% Actual correct answers | verified | latest update | Graded A+ | Already Passed | Complete Solution $7.99   Add to cart

Exam (elaborations)

CM 1011 midterm-LSU, CM 1011 Midterm - LSU Questions with 100% Actual correct answers | verified | latest update | Graded A+ | Already Passed | Complete Solution

 3 views  0 purchase
  • Course
  • Institution

CM 1011 midterm-LSU, CM 1011 Midterm - LSU Questions with 100% Actual correct answers | verified | latest update | Graded A+ | Already Passed | Complete Solution

Preview 2 out of 7  pages

  • June 26, 2024
  • 7
  • 2023/2024
  • Exam (elaborations)
  • Questions & answers
avatar-seller
CM 1011 midterm-LSU, CM 1011 Midterm - LSU
An Estimate is an educated guess - ANS-True

50 is the average number of employees per construction company in the US - ANS-False

An estimator must be pratical, but not creatvie - ANS-False - must be both pratical and creative

Housing starts are one of the major economic indicators - ANS-True

An estimator must be detail oriented - ANS-true

During the stone age, construction materials included mud, wood, and stone - ANS-True

The larger a priject is, the more it will cost - ANS-true

The code of Hammurabi dates back to the time of Julius Caesar - ANS-False - Old Babylonian
Period (1754 BC)

Site location does not impact cost - ANS-false

Early forms of concrete were invented by the romans - ANS-True

The quality of the materials is determined by the contractor - ANS-false - designer or project
owner

The creation of steel facilitated the construction of sky scrapers - ANS-True

Conceptual estiamtes must be very accurate - ANS-false - conceptual estimates happen before
a specific approach is decided for the project.Conceptual estimating is part art and part science.
The estimator has to have a "big picture" view, looking for long-range solutions rather than
shortsighted

BIM stands for Business Industry Manufacturing - ANS-False - Business Info Management

a site visit is a must before estimating a project - ANS-true

Commercial Construction is less sophisticated than residential construction - ANS-False

the 2004 CSI Master Format is a good way to organize an estimate - ANS-true

Heavy/civil construction is also known as horizontal construction - ANS-True

, Pricing of materials, labor, and equipment comes before quantifying such items - ANS-false -
after

A/E is short for architect/engineer - ANS-True

Superintendent responsibilies include personally processing pay applications - ANS-false - the
superintendent's job is to run the day-to-day operations on the construction site and control the
short-term schedule.

Increasing scarcity of water is a reason to consider green construction - ANS-True

Delivieries and inspection of materials are superintendent responsibilities - ANS-true

Being "green" is more than just having solar panels on the roof - ANS-True

Superintedent responsibilities include subcontractor coordination - ANS-true

Green construction is one that seeks the least expensive way to build something - ANS-False -
it seeks responsible and resource efficient ways

Most industrial contractors sub around 90% of the work - ANS-false - 0%

Solar orientation is an area of focus when considering green systems - ANS-True

Meetings with subconstractors should be at least weekly - ANS-true

Use of recycled and reusable materials is an area of focus for green systems - ANS-True

It is best to calculate prodctivity from the RS means book - ANS-false - progress

Access to public transportation is an area of focus when considering green sites - ANS-True

Construction impact issues many include dust control - ANS-true

Natural ventilation is an area of focus when considering green outdoor quality - ANS-False -
green systems don't focus on natural ventilation

A clean site equals a safe site - ANS-true

Life cycle costs are an area of focus when considering green impacts - ANS-True

A site layout plan does not plan address employee parking - ANS-false

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller Hkane. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $7.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

81531 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$7.99
  • (0)
  Add to cart