100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
CM 1011 Chapter 5 Questions with 100% Actual correct answers | verified | latest update | Graded A+ | Already Passed | Complete Solution $7.99   Add to cart

Exam (elaborations)

CM 1011 Chapter 5 Questions with 100% Actual correct answers | verified | latest update | Graded A+ | Already Passed | Complete Solution

 3 views  0 purchase
  • Course
  • Institution

CM 1011 Chapter 5 Questions with 100% Actual correct answers | verified | latest update | Graded A+ | Already Passed | Complete Solution

Preview 1 out of 4  pages

  • June 26, 2024
  • 4
  • 2023/2024
  • Exam (elaborations)
  • Questions & answers
avatar-seller
CM 1011 Chapter 5
Pre-Construction Stage - ANS--first
-Assign project team, due diligence, value engineering, permitting

Procurement stage - ANS--second
-Project but-out, subcontracts, purchase orders

Construction stage - ANS--third
-Mobilization, staging, layout, operations

post construction stage - ANS--fourth
-project close out, owners move-in, warranty, project evaluation

design stage - ANS-includes programming and feasibility, schematic design, design
development, and contract documents

Programming and feasibility - ANS-done prior to design and engages the owner to clarify needs

schematic design - ANS-first step of creative process consisting of sketches that identify
preliminary design characteristics

design development - ANS-detail of the work design occurs here. selection of material,
equipment and systems to go into building

contract documents - ANS--final detailed drawings known working drawings and the project
specifications are known as the CD's
-they are the plans that the builder will actually use for construction

Goal of the design team - ANS-make the building compliant with various statutory regulations.
project success relies on compliance with regulations

bidding stage - ANS--plans and specifications are produced for builders
-this stage is coordinated by the architect to assist the owner

pre-construction stage - ANS--stage where the project manager is captain of the construction
team
-one of the hardest stages

On-site and Office support - ANS-The project team is split into which two divisions?

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller Hkane. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $7.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

79373 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling

Recently viewed by you


$7.99
  • (0)
  Add to cart