100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
NCCCO Lattice Boom General Knowledge 100% Correct Answers Verified Latest 2024 Version $7.99   Add to cart

Exam (elaborations)

NCCCO Lattice Boom General Knowledge 100% Correct Answers Verified Latest 2024 Version

 0 view  0 purchase
  • Course
  • Institution

NCCCO Lattice Boom General Knowledge | 100% Correct Answers | Verified | Latest 2024 Version The lattice boom is designed to take winds of up to 20 mph. from the side plus a full rated load, plus a direct side load equal to what percent of the rated load? - 2% The part of the load chart govern...

[Show more]

Preview 2 out of 6  pages

  • July 3, 2024
  • 6
  • 2023/2024
  • Exam (elaborations)
  • Questions & answers
avatar-seller
NCCCO Lattice Boom General Knowledge |
100% Correct Answers | Verified | Latest
2024 Version
The lattice boom is designed to take winds of up to 20 mph. from the side plus a full rated load, plus a
direct side load equal to what percent of the rated load? - ✔✔2%


The part of the load chart governed by stability is based on what percentage of capacity while a crawler
crane is working over the side quadrant? - ✔✔A. 75%



The most unstable working quadrant for a crawler crane is the; - ✔✔Side



What type of capacity is listed on a crane load chart? - ✔✔Static


If the manufacture of a particular crane does not specifically permit pick and carry operations what
procedure must be followed during this operation? - ✔✔Don't make any pick and carry lifts



What is the main purpose of a jib/extension? - ✔✔To extend reach higher or up and over



When the number of layers of rope on a drum increase the line pull___________. - ✔✔Decreases



When handling boom sections, the best place for slings to be attached is; - ✔✔At the pin connections at
the ends of the top chords



Placing timber blocking under the tips of the tracks on a crawler crane will; - ✔✔Make the crane more
stable


What is the major effect of stopping suddenly a rapid swing while operating long boom crane? -
✔✔Action may cause the crane boom collapse and/or overturn the crane

, According to B30.10 hooks shall be removed from service when the throat opening exceeds _____ the
original throat opening. - ✔✔5%



On a crawler crane ground bearing pressure is greatest where? - ✔✔Over the corner


During disassembly of a long boom, the pendant lines are connected at the maximum cantilever point
and the boom is slightly lifted off the ground, which boom connection pins are to be removed next? -
✔✔The bottom pins ahead of the cantilever point


Most crane manufactures require the load chart capacities must be reduced when wind speed reaches; -
✔✔20 mph



The definition of cantilever of a lattice boom crane is; - ✔✔The boom suspended past the pendant
connections



What chart do you use when operating a crane on a barge; - ✔✔List chart



According to OSHA, Jibs must have a positive ________ from backwards overturning - ✔✔Stop



Mobile cranes on barges shall be - ✔✔Physically attached to the barge


When a crane is properly barricaded, what is the clearance required all the way around 360 degrees
between the superstructure and the barricade when swung 360 degrees? - ✔✔2 feet


According to ASME B30.5 a fire extinguisher shall have a rating of __________ and shall be available at
all operator's stations or cabs of the equipment. - ✔✔10 BC or higher



When assembling a lattice boom crane the top pins of the boom sections should be inserted; - ✔✔First


Block hoisting sheaves should have a minimum pitch diameter of at least________ the rope diameter. -
✔✔16 times

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller hov. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $7.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

81849 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$7.99
  • (0)
  Add to cart