100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
SWM DEQ Questions & answers $7.99   Add to cart

Exam (elaborations)

SWM DEQ Questions & answers

 4 views  0 purchase
  • Course
  • Institution

SWM DEQ Questions & answers

Preview 2 out of 9  pages

  • July 4, 2024
  • 9
  • 2023/2024
  • Exam (elaborations)
  • Questions & answers
avatar-seller
SWM DEQ

The Virginia Stormwater Management Program is authorized by the ______ and
administered through the ______ - ANS-Virginia Stormwater Management Act, Virginia
Stormwater Management Program Regulation

VPDES Permit/Construction GP authorizes discharge of stormwater from construction
activities that are - ANS-greater than or equal to an acre

The Stormwater Management Act requires the State Water Control Board to -
ANS-permit, regulate, and control stormwater runoff

DEQ has ___ days to complete review of real or potential inter-jurisdictional impacts
upon request - ANS-90

The Stormwater Management Act requires the following individuals to obtain and
maintain a certificate of competency - ANS-staff of a stormwater program, anyone
contracted by a VSMP authority, standard and specification holders

The dual certificate will expire three years from - ANS-the latest date of the certificates

SWM plan must be approved by ___ before land disturbance - ANS-VSMP program
authority

The water quality criteria sets a site-based load limit of ____ of total phosphorus for new
development - ANS-0.41 lbs/acre/year

The phosphorus load limit uses the - ANS-10% impervious cover

Part II B and II C water quantity criteria addresses - ANS-channel protection and flood
protection

Which two plans in the SWPPP must be approved? - ANS-SWM plan, ESC plan

Does the SWM plan address runoff during or after construction? -
ANS-post-construction

, What is the lower limit of the range of imperviousness that can result in stream
degradation? - ANS-10%

What do land disturbing activities consist of? - ANS-excavating, clearing, grading

LDA threshold for the SWM Act and Regulation - ANS-1 acre or 2500 square feet for
Chesapeake Bay Preservation Act

In situations where an initial exemption was applicable because LDAs were related to
emergency work, VSMP authority shall be advised of the disturbance within - ANS-7
days of commencing the LDA and shall submit a permit application within 30 days of
starting the land-disturbing activity

Localities with MS4 - ANS-must adopt and administer a stormwater program

Localities without MS4 - ANS-may choose to administer a VSMP or have DEQ
administer the program

DEQ is responsible for enforcing the ____ while locality ____ are responsible for
enforcing local ordinances - ANS-Construction GP, VSMP

A locality VSMP authority must include enforcement authority and a schedule of civil
penalties for enforcement actions in its local ordinance. The maximum penalty the
authority may issue is - ANS-$32,500 per violation per day

Any civil penalty assessed by a court as a result of a summons issued by a locality
VSMP authority must be paid - ANS-into the locality's treasury

Any person who violates..... shall be subject to a civil penalty not to exceed - ANS-$32,
500

Chesapeake Bay Preservation Areas that result in a land disturbance greater than or
equal to ____ and less than ____ - ANS-2,500 ft^2, 1 acre

CBPA LDAs must have - ANS-approved E&SC plan, approved SWM plan, local
approval to start land disturbance, long-term maintenance agreement, construction
record drawings

CBPA LDAs do not require - ANS-Construction GP, Pollution prevention Plan, Additional
control measures to address TMDL

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller EXAMQA. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $7.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

83100 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$7.99
  • (0)
  Add to cart