100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
TEST FROM BIGSWPPP Questions & answers $11.49   Add to cart

Exam (elaborations)

TEST FROM BIGSWPPP Questions & answers

 4 views  0 purchase
  • Course
  • Institution

TEST FROM BIGSWPPP Questions & answers

Preview 3 out of 17  pages

  • July 4, 2024
  • 17
  • 2023/2024
  • Exam (elaborations)
  • Questions & answers
avatar-seller
TEST FROM BIGSWPPP

Motives for staying in compliance with stormwater objectives include:

A. Staying out of trouble with the law
B. Appeasing environmental groups
C. Making your boss happy
D. None of these answers - ANS-A

NPDES stands for:

A. National Pollution Division of Environmental Science
B. Non Pollution Discharge Elimination Standards
C. National Pollution Development Erosion Standards
D. National Pollutant Discharge Elimination System - ANS-D

The law that set into place stormwater regulations in the 1970's is...

A. The Federal Pollution Discharge Elimination Rules
B. The Stormwater Pollution Control Act
C. The Clean Water Act
D. The National Water Control Act - ANS-C

Regulations for managing Stormwater Activity on a construction site are outlined in
the...
A. NOI
B. NOT
C. NPDES
D. DOT - ANS-C

When should you read and understand your project Stormwater Pollution Prevention
Plan (SWPPP)?

A. After the project Owner calls you to their office
B. After an Agency inspector visits the job site
C. Immediately after project award and before you begin any site work
D. During project closeout - ANS-C

,Which of the following is a not an allowable stormwater discharge or non-stormwater
discharge

A. Discharge from dewatering activities
B. Discharge from borrow areas
C. Discharge from staging areas
D. Discharge of contaminated groundwater - ANS-D

Construction activity may begin

A. When the jurisdiction of operations specifies you can start
B. Immediately after equipment shows up on site
C. Right after a rain event
D. Once you have called the State - ANS-A

Waters that fail anti-degradation standards are placed on the ______ list.

A. 303d
B. none of the above
C. 404a
D. 301d - ANS-A

SWPPP certifications are signed by

A. The project engineer
B. An Officer of the Project Owner or an Officer of the General Contractor
C. Anyone with a pen
D. Any one on the project site - ANS-B

The Notice of Termination can be filed when

A. All construction, inside and outside the building is complete and final stabilization has
been verified as complete
B. At the end of the rainy season
C. Only offsite street work is left.
D. GC believes site meets permit requirements for final stabilization and notes this on a
daily report - ANS-A

Operators on a construction site are the entity in charge of plans and specification and
the entity who ...

, A. ... brings lunch to the site
B. ... is in charge of daily activities
C. ... visits the property weekly
D. ... sends reports to the owner and other interested parties - ANS-B

TRUE/FALSE

The document that must be completed, signed and submitted to the state to obtain
authorization to discharge is the NOT. - ANS-False

TRUE/FALSE

Construction sediment is not considered a potential pollutant source. - ANS-False

TRUE/FALSE

The Notice of Intent (NOI) must be submitted to the appropriate regulatory agency
before the Stormwater Prevention Plan is developed. - ANS-False

TRUE/FALSE

The name of the list of impaired waters is called the Total Maximum Daily Load (TMDL)
List - ANS-False

A well constructed SWPPP for your site should be...

A. Created as soon as it starts raining
B. Copied from a similar site
C. Generic
D. Site specific - ANS-D

The NOI must be submitted...

A. Prior to commencing construction
B. After commencing construction
C. By anyone conducting land disturbing activities
D. Once you bring contaminated materials on site - ANS-A

One necessary component of a good SWPPP is

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller EXAMQA. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $11.49. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

71498 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$11.49
  • (0)
  Add to cart