100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
PLTW CEA Key Terms 2.3 Questions and Answers Latest (2024 / 2025) (Verified Answers) $12.99   Add to cart

Exam (elaborations)

PLTW CEA Key Terms 2.3 Questions and Answers Latest (2024 / 2025) (Verified Answers)

 10 views  0 purchase
  • Course
  • PLTW CEA
  • Institution
  • PLTW CEA

PLTW CEA Key Terms 2.3 Questions and Answers Latest (2024 / 2025) (Verified Answers)

Preview 2 out of 10  pages

  • July 5, 2024
  • 10
  • 2023/2024
  • Exam (elaborations)
  • Questions & answers
  • PLTW CEA
  • PLTW CEA
avatar-seller
NurseFerian
PLTW CEA Key Terms 2.3
1.A horizontal ledge cut between the foot and top of an embankment to
stabilize the slope by intercepting sliding earth.
ANS Berm
2.Legal requirements designed to protect the public by providing guidelines
for structural, electrical, plumbing, and mechanical areas of a structure.
ANS Build- ing Code
3.The portion of a building that encloses the treated environment, including
the walls, ceiling or roof, and floor.
ANS Building Envelope
4.The various conductors, connections, and devices found along the path of electric flow from the source through the components and back to the source.
ANS Circuit
5.An electric safety switch that automatically opens a circuit when excessive amperage occurs.
ANS Circuit Breaker .A fitting with a removable plug that is placed in plumbing drainage pipe lines to allow access for cleaning out the pipe.
ANS Cleanout
7.Cone-bearing trees with year-round leaves that are long, thin, and nee- dle-like.
ANS Coniferous
8.Five broad categories of construction found in the International Building Code that are based on the fire-resistive capabilities of the materials used.
ANS - Construction Type
9.Broad-leafed trees that seasonally shed their leaves.
ANS Deciduous
10.A box in which the wires from the meter are connected to individual circuit
breakers, which are connected to separate circuits for distribution to various
locations throughout the building.
ANS Distribution Panel
11.Any pipe that carries wastewater or water-borne wastes in a building drainage system.
ANS Drain
12.Removal of groundwater or surface water, or of water from structures, by

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller NurseFerian. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $12.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

79271 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$12.99
  • (0)
  Add to cart