100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
ICC CALIFORNIA UST INSPECTOR EXAM QUESTIONS AND ANSWERS ALREADY GRADED A+ UPDATED SUMMER 2024 $14.99   Add to cart

Exam (elaborations)

ICC CALIFORNIA UST INSPECTOR EXAM QUESTIONS AND ANSWERS ALREADY GRADED A+ UPDATED SUMMER 2024

 15 views  0 purchase
  • Course
  • Institution

ICC CALIFORNIA UST INSPECTOR EXAM QUESTIONS AND ANSWERS ALREADY GRADED A+ UPDATED SUMMER 2024

Preview 4 out of 91  pages

  • July 13, 2024
  • 91
  • 2023/2024
  • Exam (elaborations)
  • Questions & answers
avatar-seller
ICC CALIFORNIA UST INSPECTOR EXAM
QUESTIONS AND ANSWERS ALREADY
GRADED A+ UPDATED| SUMMER 2024

Which agency approves a site-specific variance which allows for an alternative methodof
construction or monitoring:
a.) The Regional Water Quality Board
b.) The State Water Resources Control Board
c.) The Department of Toxic Substance Control
d.) The local agencya.) The Regional Water Quality BoardCCR Title 23, Sec 2681(a)

The regulations to enforce compliance of underground storage tank systems in the stateare
found in?
a.) Code of Federal Regulations, 40 CFR Part 281
b.) California Code of Regulations, Title 23, Chapter 16
c.) Code of Federal Regulations, 40 CFR Part 280
d.) California Code of Regulations, Title 23, Chapter 17 b.) California Code of
Regulations; Title 23, Chapter 16

By definition an "underground storage tank system" includes
a.) The tank, all connected piping and dispensers
b.) The tank, all connected piping, ancillary equipment and containment system
c.) Only the tank
d.) Only tanks totally beneath the surface of the ground b.) The tank, all connected
piping, ancillary equipment and containment system

(H&SC, Sec 25281(z))

The written report submitted to the local agency after an unauthorized release isrequired to
include the following except:
a.) Description of actions taken to stop the release
b.) Cause of the release
c.) Method of disposal of released product
d.) Date on which the release was discovered b.) Cause of the releaseCCR Title 23, Sec
2652(c)

An unauthorized release which does not escape from secondary containment onlyrequires a
record on the operator's monitoring reports provided:

• It did not increase the hazard of fire
• It did not cause any deterioration of the secondary containment
• It was cleaned up within 8 hours of detection

,• All of the above D. All of the aboveH&SC, Sec 25294

The annual monitoring certification may be performed by:
• A person possessing the appropriate contractors licenses
• An individual trained and certified by the manufacturer of the monitoring
equipment
• A designated UST operator
• A person who meets the requirements of both a and b D. A person who
meetsthe requirements of both a and b
CCR Title 23, Sec 2715(i)

When an automatic tank gauge is utilized for single-walled tank leak detection, it shallgenerate
a post-test hard copy data report of the following information, except:
a.) Liquid volume b.) Fuel depth
c.) Outside air temperature
d.) Time and date of test c.) Outside air temperatureCCR Title 23, Sec 2643(b)(1)

a.) 85%
b.) 95%
c.) 90%
d.) 80%

If a UST system is utilizing an overfill alarm, the alarm must be triggered to alert thetransfer
operator when the tank is no more than full



c.) 90%

An automatic tank gauge is utilized for leak detection of the .
a.) Tank
b.) Tank and Piping
c.) Piping
d.) Interstitial space a.) Tank CCR Title 23, Sec 2643(b)(1)

After completion of enhanced leak detection (ELD) test, the ELD test results must besubmitted
to the .
a.) The local agency
b.) The SWRCB
c.) Owner of the UST system
d.) To both the SWRCB and the local agency d.) To both the SWRCB and the localagency
CCR Title 23, Sec 2644.1(a)(5)

A permit to operate a UST system must have all of the following listed on the permit,
EXCEPT:

,a.) The state UST identification number(s)
b.) Name of the tank manufacturer and tank capacity
c.) Permit expiration date
d.) Monitoring requirementsb.) Name of the tank manufacturer and tank capacityCCR Title
23, Sec 2712(c)

A temporary closure is appropriate for which of the following:
a.) The UST system is empty and will be removed from service indefinitely
b.) The UST system has ceased to store hazardous materials but will be used within the
next 12 consecutive months
c.) The UST system is unable to meet compliance requirements and will be removed
d.) The UST system has been red-taggedb.) The UST system has ceased to store hazardous
materials but will be used within the next 12 consecutive months
CCR Title 23, Sec 2671 & 2670

A local agency determines that a UST facility within the last year had compliance issues.
Prior to issuing a new permit or renewal to operate an UST the local agencyshall:
a.) Ask the state to assist in a joint inspection
b.) Request the owner/operator to submit a "Return to Compliance" form.
c.) Refer to a District Attorney Investigator
d.) Inspect the facility and determine compliance d.) Inspect the facility anddetermine
compliance
CCR Title 23, Sec 2712(c)

All the following components require third party certification, except:a.) Automatic tank
gauging systems
b.) Statistical inventory reconciliation methods
c.) Spill Containment lids
d.) Liquid phase out-of-tank products c.) Spill Containment lids

The exterior surface of an underground storage tank must bear a marking or labelwhich shows
the following information, except:
a.) Design pressure in psig
b.) Useable capacity in gallons.
c.) Width of the interstitial space
d.) Identity of manufacturerc.) Width of the interstitial spaceCCR Title 23, Sec 2631(b)

Which of the following is not a confined space:
a.) A really deep turbine sump
b.) A space not designed for continuous employee occupancy
c.) An area with limited access
d.) An area with limited ventilation d.) An area with limited ventilation

CCR Title 8, Sec 5157(b)

, A secondary containment system which is not an integral part of primary containment
shall be designed and constructed according to an engineering specification approved bya
third party. The secondary containment system shall contain of the volume of the largest
primary container within it, in the case of multiple primary containers:
a.) 100 percent
b.) 10 percent
c.) 110 percent
d.) 150 percent d.) 150 percent CCR Title 23, Sec 2631(e)(1)(B)

All the following are approved overfill prevention systems, except:
a.) Automatic shutoff devices
b.) Spill Containers
c.) Overfill alarms
d.) Flapper valves b.) Spill ContainersCCR Title 23, Sec 2635(b)(2)

Automatic line leak detectors shall be installed on underground pressurized piping with
secondary containment and shall be capable of detecting a:
a.) 3-gallon per hour leak rate at 5 psi within 1 hour.
b.) .1-gallon per hour leak rate at 5 psi within 1 hour.
c.) 3-gallon per hour leak rate at 10 psi within 1 hour.
d.) .1-gallon per hour leak rate at 10 psi within 1 hour. c.) 3-gallon per hour leak
rate at 10 psi within 1 hour.
CCR Title 23, Sec 2636(f)(2)(f)(3) & 2643(c)(1)

Individuals installing an Underground Storage Tank System shall meet all of the following,
except:
a.) California Licensed Tank Tester
b.) Possess the appropriate Contractors State License Board license.
c.) Effective January 1, 2005, the individual shall possess a current underground storagetank
system installer certificate from the ICC UST Installation/Retrofitting exam.
d.) The individual has been adequately trained as evidenced by a certificate of training issued
by the manufacturer(s) of the underground storage tank system component(s) being
installed. a.) California Licensed Tank Tester
CCR Title 23, Sec 2715(g)(h)

Which of the following would not require secondary containment testing?
a.) Interstitial space hydrostatically monitored
b.) Under-dispenser containment
c.) Turbine piping sump
d.) Secondary pipinga.) Interstitial space hydrostatically monitoredCCR Title 23, Sec 2637(g)


Fiberglass tanks shall be repaired by the following, except:
a.) Small fractures and fissures may be repaired with epoxy
b.) Fiberglass cloth with a minimum dimension 12 x 12 inches centered over the areato
be repaired.

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller Hosmerit. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $14.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

81311 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$14.99
  • (0)
  Add to cart