SAFE 4 ADVANCED SCRUM MASTER (4.5) PRACTICE QUESTIONS WITH COMPLETE SOLUTIONS
SAFE 4 ADVANCED SCRUM MASTER (4.5) PRACTICE QUESTIONS WITH COMPLETE SOLUTIONS Which statement is true about the phase-gate milestone model and risk reduction? - Correct Answer *Answer is 'A'* A. *It does not mitigate risk as intended* B. It creates large batches of requirements C. It reduces product increment values D. It helps to visualize and limit WIP -- When does the Inspect and Adapt event happen? - Correct Answer *Answer is 'D'* A. At the end of the System Demo B. At the end of every two weeks C. At the end of the second day of PI Planning D. *At the end of each PI* -- Who reviews the top capabilities for the upcoming PI? - Correct Answer *Answer is 'C'* A. Project Manager B. Solution Architect/Engineer C. *Solution Management* D. Project Owner -- Why should team members continuously and actively engage with other teams during PI Planning? - Correct Answer *Answer is 'C'* A.To manage dependencies and resolve impediments B. To understand how the other team is working C. *To foster an environment of capacity and velocity* D. To create a backlog of features the team can adopt --
Written for
- Institution
- SAFe
- Course
- SAFe
Document information
- Uploaded on
- July 16, 2024
- Number of pages
- 23
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
which statement is true about the phase gate miles
-
when does the inspect and adapt event happen
-
who reviews the top capabilities for the upcoming