Exam (elaborations)
4B - U4 Chapter 2, 5 Boiler Start-up, Shutdown (moodle)
- Course
- Institution
If you have a single boiler in the plant feeding steam lines: Select one: a. It is advisable to warm up the steam header with the boiler stop, header stop and the drains open. b. Never heat up the boiler and steam lines at the same time. c. Always bring the boiler up to full pressure before star...
[Show more]