Exam (elaborations)
NASCLA GC Exam Questions with complete Solution.
NASCLA GC Exam Questions with complete Solution.
[Show more]
Preview 2 out of 13 pages
Uploaded on
August 1, 2024
Number of pages
13
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
Institution
NASCLA
Course
NASCLA
$10.49
Also available in package deal from $35.99
100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached
Also available in package deal (1)
$ 168.76
$ 35.99
14 items
1. Exam (elaborations) - Nascla exam questions with 100% correct answers!!
2. Exam (elaborations) - Nascla contractors guide arkansas 5th edition questions with verified answers.
3. Exam (elaborations) - Nascla books combined questions with verified answers.
4. Exam (elaborations) - Nascla contractors guide arkansas 8th edition questions with verified answers.
5. Exam (elaborations) - Nascla gc exam questions with complete solution.
6. Exam (elaborations) - Nascla contractors guide to business, law, and project management exam question and a...
7. Exam (elaborations) - Mhic nascla contractors exam review exam questions with verified answers.
8. Exam (elaborations) - Nascla contractors guide 3 exam questions with verified answers.
9. Exam (elaborations) - Nascla gc exam questions with verified answers.
10. Exam (elaborations) - Nascla business, law, and project management 13th edition - test 1 questions with ver...
11. Exam (elaborations) - Exam1 prep nascla contractor-s guide to business, law, and project management, florid...
12. Exam (elaborations) - Nascla - contractors guide to business, law, and project management questions with ve...
13. Exam (elaborations) - Business, law & project management (nascla) exam questions with verified answers
14. Exam (elaborations) - Nascla contractors guide questions with verified answers.
Show more
NASCLA GC Exam Questions with complete Solution. precast lfloor lpanel ljacking l- l(correct lanswer) l-removed lwhen lgrout lhas lhardened corbel l- l(correct lanswer) l-used lto lsupport lstructural lbeams concrete lpanels l- l(correct lanswer) l-help lwith lrapid lconstruction lift lwall lpanels l- l(correct lanswer) l-at ledges dunnage lcontinuous l- l(correct lanswer) l-only lfor lone lstack value lengineering l- l(correct lanswer) l-only lduring ldesign lphase superintendent l- l(correct lanswer) l-is lresponsible lfor l"as lbuilt" ldrawings shop ldrawings l- l(correct lanswer) l-fabricator lor lmanufactur er CPM l- l(correct lanswer) l-start lwork lat ldifferent ltimes lbut lfinish lat lthe lsame ltime laydown l- l(correct lanswer) l-area lused lto lstore lmaterials keep lapproved lsubmittals l- l(correct lanswer) l-on lthe ljob lsite submittals l- l(correct lanswer) l-impact lschedule addendum l- l(correct lanswer) l-during lbid/before lcontract change lorder l- l(correct lanswer) l-after lcontract owner lis lresponsible l- l(correct lanswer) l-for lmaking lsure lsite lis lready lto lbuild PM lis lunlikely lto lwork lwith l- l(correct lanswer) l-"as lbuilt" ldrawings NFPA lPamphlet l72 l- l(correct lanswer) l-audible lrequirements lfor lsmoke ldetectors stair lrisers l- l(correct lanswer) l-4" lmin/7" lmax ramps lwith lrise lgreater lthan l6" lmust lhave l- l(correct lanswer) l-handrail grab lbars lin lshower l- l(correct lanswer) l-33-36" toilets l16-18" l- l(correct lanswer) l-from lside lwall grab lbars l- l(correct lanswer) l-support l250 llbs 24" lback lfrom lcenter lof lwasher ldoor l- l(correct lanswer) l-distance lfor lwheelchair door lhardware lbtw/ l- l(correct lanswer) l-34 land l48" door lopening lswitch llocation l- l(correct lanswer) l-outside larc lof ldoor accessible lroute l- l(correct lanswer) l-36" 60" ldiameter l- l(correct lanswer) l-turnaround lfor lwheelchair max lslope lfor lany lfloor lsurface l- l(correct lanswer) l-1:48 van lspace lwidth l- l(correct lanswer) l-reduced l36" height lof lelevator lkeypad l- l(correct lanswer) l-54" minimum lramp llanding llength l- l(correct lanswer) l-60" ramps lwith lslopes lover l1:20 l- l(correct lanswer) l-require lhandrail maximum lvertical lchange lin llevel lground l- l(correct lanswer) l-1/4" airentraining lagent l- l(correct lanswer) l-prevents lfreeze -thaw ldamage calcium lchloride l(accelerator) l- l(correct lanswer) l-increases lsetup, lused lin lcold lweather sugar l(retarder) l- l(correct lanswer) l-slows lsetup, lused lin lheat fiber ltube lforms l- l(correct lanswe r) l-require lstiffeners curing lcontrols ldrying l- l(correct lanswer) l-hydration lis lneeded never lpour lconcrete lon lfrozen lground l- l(correct lanswer) l-below l40 lis l"cold lweather lconcrete" bull lfloat l- l(correct lanswer) l-knock ldown lhighs land llows vibrator l- l(correct lanswer) l-makes lconcrete lmore ldense