Liquidated damages are the daily amount of time paid by the contractor to the owner for each day that
the project fails to meet the completion dated specified in the contract. - False
Conceptual estimating through the design process can ensure that the completed design is in line with
the budget...
Cooke's C UMULATIVE COSC 153 -FINAL Liquidated damages are the daily amount of time paid by the contractor to the owner for each day that the project fails to meet the completion dated specified in the contract. - False Conceptual estimating through the design process can ensure that the completed design is in line with the budget. - True "A Superintendent can't __________ quality; they must __________ for quality." - EXPECT; INSPECT 3WLA schedules are prepared by who? - Superintendent A 3WLA schedule is which level of schedule? - Level 4 A contingency is a % added to the estimate. - TRUE A mock -up is separate from the building. - True A site logistics plan should include: - Material Storage Zones, Location of temporary field offices, Location of temporary measures, Security Measures for Construction, Location of the field office, Location of the temporary utilities, Location of the storage trailers, Location of the laydown area, Location of the portable toilets, Location of dumpsters, On-site parking areas, Security fencing, and the entrance and exit gates Assignment 8 had you study 5 construction software packages. What is the software package for scheduling? - Primavera Conceptual estimating through the design process can ensure that the completed design is in line with the budget. - True Construction estimates are typically organized by construction specification institute division of work. - True __________ as defined in Primavera Schedule software; __________ as defined in Microsoft Project software. - ACTIVITIES; TASKS Construction results in 40% of all waste in the North America. - True Grizzly: What are the Key Factors to Becoming a Successful Business Owner? - Work Your Butt Off!!, Sound Counsel/Mentors, Networking, Continue Learning, Risk, People, and WORK YOUR BUTT OFF!! How can construction waste be minimized? - By recycling, reusing, and eliminating waste in the first place during design
The benefits of buying summaries with Stuvia:
Guaranteed quality through customer reviews
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
Quick and easy check-out
You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.
Focus on what matters
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
Frequently asked questions
What do I get when I buy this document?
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Satisfaction guarantee: how does it work?
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Who am I buying these notes from?
Stuvia is a marketplace, so you are not buying this document from us, but from seller ACADEMICMATERIALS. Stuvia facilitates payment to the seller.
Will I be stuck with a subscription?
No, you only buy these notes for $7.99. You're not tied to anything after your purchase.