100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
ACI Concrete Field Testing Technician- Grade I Latest Update Actual Exam 150 Questions and 100% Verified Correct Answers Guaranteed A+ $20.49   Add to cart

Exam (elaborations)

ACI Concrete Field Testing Technician- Grade I Latest Update Actual Exam 150 Questions and 100% Verified Correct Answers Guaranteed A+

 4 views  0 purchase
  • Course
  • ACI Concrete Field Testing Technician- Grade I
  • Institution
  • ACI Concrete Field Testing Technician- Grade I

ACI Concrete Field Testing Technician- Grade I Latest Update Actual Exam 150 Questions and 100% Verified Correct Answers Guaranteed A+

Preview 2 out of 15  pages

  • August 2, 2024
  • 15
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • ACI Concrete Field Testing Technician- Grade I
  • ACI Concrete Field Testing Technician- Grade I
avatar-seller
Tutordiligent
ACI Concrete Field Testing Technician- Grade I
Latest Update 2024-2025 Actual Exam 150
Questions and 100% Verified Correct Answers
Guaranteed A+

A 6 by 12 in [150 mm by 300 mm] cylinder mold can be used for concrete containing
aggregate with particles not exceeding _____ in size, without the need for wet sieving
the concrete. - CORRECT ANSWER: 2 in. [50 mm]


A composite sample of concrete is required even if the only purpose for obtaining the
sample is to determine temperature. True of False? - CORRECT ANSWER: False


A mallet weighing ____ must be used to tap the sides of the bowl after rodding each
layer. - CORRECT ANSWER: 1.25 +- 0.50 lb. (600 +- 200 g)


A maximum temperature of freshly mixed concrete is specified in ASTM C1064. True of
False? - CORRECT ANSWER: False


A plastic container can be used for the measure in this method. True or False? -
CORRECT ANSWER: False, measure must be steel or another suitable metal


According to ASTM C1064, what is one reason to take the temperature of concrete? -
CORRECT ANSWER: Verify conformance to a specified requirement for temperature of
concrete


After completing the strike-off procedure, what must be done before weighing the
measure and sample? - CORRECT ANSWER: Clean off any excess concrete


After consolidation of the final layer, an excess of concrete ____ above the top of the
measure is considered optimum. - CORRECT ANSWER: 1/8 in. [3 mm]

, After molding test specimens, you should wait two hours before moving them to the
location of initial storage. True or False? - CORRECT ANSWER: False; the specimens
must be moved immediately


After rodding each layer, what should be done to the measure before adding another
layer of concrete? - CORRECT ANSWER: Tap the sides of the measure smartly 10 to
15 times with the mallet


After the final rodding, the sides of the slump mold should should be tapped lightly with
the tamping rod. True or False? - CORRECT ANSWER: False


After the temperature of the concrete is read, what is required? - CORRECT ANSWER:
Reporting of temperature


Air meter bowls used for this test must conform to ASTM _____ and be calibrated for
volumee according to ASTM _____. - CORRECT ANSWER: C231, C29


ASTM Method gives standardized requirements for _____, _____, _____, and _____, of
test specimens. - CORRECT ANSWER: Making, curing, protecting, transporting


At the end of the procedure, the air meter is _____. - CORRECT ANSWER:
Disassembled and its contents examined


Concrete mixtures with specified strengths of 6000 psi [40 MPa] or greater shall have
an initial curing temperature between __________. - CORRECT ANSWER: 68 and 78
degrees F [20 and 26 C]


Concrete samples from a truck mixer must be obtained before any water or admixtures
are added to the mixer at the job site. True or False? - CORRECT ANSWER: False


Cylinders made for the purpose of determining when a structure may be put into service
shall be removed from the mold __________. - CORRECT ANSWER: At the time of the
removal of formwork

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller Tutordiligent. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $20.49. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

81989 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$20.49
  • (0)
  Add to cart