100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
MTA Subway Mods 1 to 5 questions and answers rated A+ 2024/2025 $9.99   Add to cart

Exam (elaborations)

MTA Subway Mods 1 to 5 questions and answers rated A+ 2024/2025

 2 views  0 purchase
  • Course
  • MTA
  • Institution
  • MTA

MTA Subway Mods 1 to 5 questions and answers rated A+ 2024/2025

Preview 1 out of 3  pages

  • August 2, 2024
  • 3
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • mta
  • MTA
  • MTA
avatar-seller
AllLegitExams
MTA Subway Mods 1 to 5

Metro pumping stations - ANSLocated in low points in metro stations. Remove groundwater,
storm runoff, or water associated with fire fighting efforts.

Rail car battery backup system - ANSThis system runs for 60 minutes after power failure. Keeps
lights and communication systems operational until system starts to load shed, first dropping
lights, then communications.

MOW,
Maintenance of Way
department - ANSResponsible for maintaining clear, safe, and navigable railways and right of
way: metro bridges fences walls gates lighting and security structures.

MOCC - ANSMetro operations control center located above Lexington market

Metro stations - ANSThere are 14 stations in the metro system. Three stations at surface, three
are Ariel, and eight are underground.

Yard Tower - ANSControls activity in the wabash yard. In the event of an emergency the yard
tower can assume control of operations.

Interlockings - ANSCrossover areas that contain remotely controlled train switches, also called
crossover switches,that allow trains to switch tracks. Dangerous and should be approached with
caution.

Track bed - ANSBuilt up from grade, lined with ballast or stones, that distribute the weight of the
rails and trains. Cross ties are laid on top of the ballast and rails run over the cross ties.

Chain markers - ANSLocated every 200 feet, chain markers identify track locations relative to
Charles center. Letters indicate whether the track is either Northwest or north east of Charles
center; numbers indicate the number of feet from Charles center.

Who must be notified before entering any track area. - ANSMOCC or the yard tower.

The four hand signals - ANS1. Move forward
2. Reduce speed and be prepared to stop
3. Stop
4. Back up

Number of aboveground hatches located on sidewalks that lead to vent shafts or emergency
stairwells - ANS23

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller AllLegitExams. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $9.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

76800 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$9.99
  • (0)
  Add to cart