CM 4101 Final Exam | With 100% Correct Answers, Graded A During which of the following process, questions such as what activities should be scheduled are typically asked and answered? a. Planning b. Scheduling c. Control Using traditional bar charts, it is always easy to tell the logic relationsh...

[Show more]

Preview 2 out of 7  pages

  • August 4, 2024
  • 7
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • CM 4101
  • CM 4101
avatar-seller
Bri254
CM 4101 Final Exam


During which of the following process, questions such as what activities should be
scheduled are typically asked and answered?

a. Planning
b. Scheduling
c. Control

Using traditional bar charts, it is always easy to tell the logic relationships between
activities.

a. True
b. False

An event consumes

a. Resources
b. Time
c. Both Resources and Time
d. Neither resources nor time

Which of the following is correct regarding CPM and PERT?

a. The calculations in CPM are non-deterministic and those in PERT are deterministic
b. The calculations in CPM are deterministic and those in PERT are non-deterministic
c. The calculations in both are deterministic
d. The calculations in both are non-deterministic

Assume A is a milestone of a project, which of the following statement(s) can be true?

a. A may take 3 days
b. A needs one mason and two helpers to finish
c. A costs $2,000
d. A can at least be crashed by 1 day
c. None of the above

An activity's scheduled early start time is at the beginning of day 10. Its duration is 5
days. Its total float is 7 days. If the activity is actually finished at the end of day 21,
which of the following statement(s) must be true?

a. The project will be delayed because of this activity
b. The status of this activity will not cause a possible delay to the entire project

, c. The early start time of the successors of this activity will be delayed
d. None of the above

The forward pass along in the Critical Path Method can be used to determine

a. Total Float
b. Activity early finish time
c. Activity late finish time
d. None of the above

Arrow diagrams use link to represent activities

a. True
b. False

Choose all that are NOT true to a non-critical activity (Assume the total float of critical
activities is zero)

a. Total float is not equal to zero
b. Total float is smaller than free float
c. Free float is always equal to zero
d. Lag is always equal to zero
e. None of the above

After resource leveling, the duration of a project may be changed?

a. True
b. False
c. Cannot be determined

A significant difference between "planning" and "scheduling" is:

a. Scheduling determines what is going to be done, and planning determines how to do
b. Scheduling determines how to do, and planning determines what to do
c. Scheduling determines when to do, and planning determines what to do, how to do,
and by whom
d. Scheduling determines how to do, and planning determines by whom

What is not true about classic bar charts?

a. Bar charts use a time-scaled presentation
b. Bar charts often directly show resource consumption of each activity
c. Bar charts can show the relative of each activity
d. Bar charts cannot show the actual status of a project

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller Bri254. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $15.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

73091 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$15.99
  • (0)
  Add to cart