100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
CATEGORY 3 NON-CAB OPERATED REAL TEST NEWEST VERSION ACTUAL 75 QUESTION AND CORRECT DETAILED VERIFIED ANSWERS FROM VERIFIED SOURCES BY EXPERT RATED A GRADE. $18.49   Add to cart

Exam (elaborations)

CATEGORY 3 NON-CAB OPERATED REAL TEST NEWEST VERSION ACTUAL 75 QUESTION AND CORRECT DETAILED VERIFIED ANSWERS FROM VERIFIED SOURCES BY EXPERT RATED A GRADE.

 7 views  0 purchase
  • Course
  • CATEGORY 3 NON-CAB OPERATED
  • Institution
  • CATEGORY 3 NON-CAB OPERATED

CATEGORY 3 NON-CAB OPERATED REAL TEST NEWEST VERSION ACTUAL 75 QUESTION AND CORRECT DETAILED VERIFIED ANSWERS FROM VERIFIED SOURCES BY EXPERT RATED A GRADE.

Preview 2 out of 12  pages

  • August 4, 2024
  • 12
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • category 3 non cab
  • CATEGORY 3 NON-CAB OPERATED
  • CATEGORY 3 NON-CAB OPERATED
avatar-seller
teachme2expert
CATEGORY 3 NON-CAB OPERATED REAL TEST NEWEST
VERSION ACTUAL 75 QUESTION AND CORRECT DETAILED
VERIFIED ANSWERS FROM VERIFIED SOURCES BY EXPERT
RATED A GRADE.


Which of the following is considered to be the best way the operator
can ensure the crane is safe to operate on any given day? - ANSWER-
Perform Daily Pre-use Checks


When crane accidents happen, you must do all of the following EXCEPT:
- ANSWER-Continue to operate the crane until all lifts are completed


Components that provide protection for operation and maintenance
personnel working on or in the path of cranes. - ANSWER-General
Safety Devices


If the crane operator and the rigger in charge disagree on whether or
not a load is safe to lift the operator should: - ANSWER-not operate the
crane until contacting the supervisor to resolve the issue.


Components that support the load, and upon failure would cause
dropping or uncontrolled lowering of the load are ____________. -
ANSWER-load bearing parts

, What is meant by "skewing"? - ANSWER-Where one end of the bridge
gets ahead of the other end, frequently causing binding on the rails.


What are the principal parts of an overhead traveling crane? - ANSWER-
Bridge girders, end trucks, trolley, and operator's cab or pendant control


Why shall sudden starts and stops of the bridge and trolley be avoided?
- ANSWER-Sudden starts and stops could cause the trolley or bridge to
derail


Select the proper method of landing a load. - ANSWER-Lower the load
slowly, stop a few inches from the landing point, then slowly lower the
rest of the way.


The crane operator must check the certification information on the
crane for________ before operating the crane. - ANSWER-certification
expiration date, crane ID, and certified capacity


What is the bridge crane communications hand signal pictured, with the
palms up, fingers closed; thumb pointing in the direction of motion, and
jerking horizontally? - ANSWER-Trolley travel


At what point during a lift may trolley or bridge travel be started? -
ANSWER-When the tracks are clear and the load is high enough off the
ground to pass over obstacles safely

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller teachme2expert. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $18.49. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

73091 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$18.49
  • (0)
  Add to cart