100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
NOI certification questions and correct answers (elaborations) with 100% accurate , verified , latest fully updated , 2024/2025 ,already passed , graded a+, complete solutions guarantee distinctions rationales| 5-star rating $7.99   Add to cart

Exam (elaborations)

NOI certification questions and correct answers (elaborations) with 100% accurate , verified , latest fully updated , 2024/2025 ,already passed , graded a+, complete solutions guarantee distinctions rationales| 5-star rating

 4 views  0 purchase
  • Course
  • Stormwater Erosion and Sedimentation Control certi
  • Institution
  • Stormwater Erosion And Sedimentation Control Certi

NOI certification questions and correct answers (elaborations) with 100% accurate , verified , latest fully updated , 2024/2025 ,already passed , graded a+, complete solutions guarantee distinctions rationales| 5-star rating

Preview 3 out of 21  pages

  • August 5, 2024
  • 21
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • Stormwater Erosion and Sedimentation Control certi
  • Stormwater Erosion and Sedimentation Control certi
avatar-seller
AnswersCOM
NOI certification
A completely dry sediment trap is more efficient than one containing some depth of water
True
False - ANS-False

A concrete washout structure:
must have at least 4" of freeboard at all times
may be prefabricated or constructed on site
must be lined with impervious material
is typically 10'x10'x3'
all of the above - ANS-all of the above

A contractor may work outside the limit of disturbance shown on an approved plan without prior
approval provided additional sediment controls are installed.
true
false - ANS-false

A filter bag must be replaced when it
becomes full of sediment
the geotextile becomes clogged
the bag develops a rip or tear
any of the above - ANS-any of the above

A grading unit as it pertains to Maryland regulations is
10 acres
20 acres
35 acres
50 acres - ANS-20 acres

A mountable berm is typically used where an earth dike needs to be traversed by construction
equipment
True
False - ANS-True

A NOI must be submitted and coverage obtained under the NPDES General Permit for
Construction Activity for any construction site that disturbs:
5,000 square feet or more
1 acre or more
½ acre or more
5 acres or more - ANS-1 acre or more

,A perimeter dike/swale -1 (PDS-1) can be used as a clear water diversion when:
the drainage area is less than two acres
the drainage area is less than one acre
the slope of the drainage area is less than 10%
a PDS-1 is never allowed as a clear water diversion - ANS-a PDS-1 is never allowed as a clear
water diversion

A pre-construction meeting is:
a discussion of the permit process only
the time a developer submits the NOI for the project
a meeting between the inspector and the developer/contractor to review the approved erosion &
sediment control plan and discuss implementation
all of the above. - ANS-a meeting between the inspector and the developer/contractor to review
the approved erosion & sediment control plan and discuss implementation

A primary goal of ESD is to
limit new development as much as possible
mimic natural runoff conditions when developing a site
provide additional jobs for engineers and plan reviewers
none of the above - ANS-mimic natural runoff conditions when developing a site

A sediment trap can be created by excavation, formed by an embankment, or a combination of
both.
True
False - ANS-True

A sediment trap may be used as a concrete washout facility.
True
False - ANS-false

A sediment trap or basin can be an acceptable dewatering practice.
True
False - ANS-true

A soil test is required prior to permanent stabilization on a site with a disturbed area greater than
five acres.
True
False - ANS-True

A stabilized construction entrance:
is made up of Class I riprap or equivalent recycled concrete.
uses nonwoven geotextile underneath the stone/recycled concrete.
should slope toward the exterior of the site so runoff from SCE flows offsite.
none of the above - ANS-uses nonwoven geotextile underneath the stone/recycled concrete.

, A stop-work order can not be issued for a construction project without first issuing a warning, as
progressive enforcement is required by all enforcement agencies.
true
false - ANS-False

A storm drain diversion may discharge to silt fence.
True
False - ANS-False

A temporary earth dike is differentiated from a temporary swale on a plan sheet by:
dikes and swales use a different lettering system to denote their type.
dikes and swales use a different numbering system to denote flow channel stabilization
a dike is shown with a single arrow and a swale with a double arrow as its standard symbol
they will be denoted in the same manner as they are interchangeable
none of the above - ANS-a dike is shown with a single arrow and a swale with a double arrow

A temporary sediment basin or trap is designed to:
reduce the number of lots available for development on a project
detain sediment-laden water allowing sediment to settle out prior to discharge of runoff
Reduce the discharge of a 10 year storm event
all of the above - ANS-detain sediment-laden water allowing sediment to settle out prior to
discharge of runoff

A temporary sump pit is designed for durations of ________ or less.
one month
three months
four months
six months - ANS-three months

Accumulated sediment must be removed from behind a Temporary Stone Outlet Structure when
the sediment deposition is within ______ of weir crest:
5 inches
6 inches
7 inches
8 inches - ANS-6 inches

Adequate vegetative covers requires _____ percent ground cover.
50
80
95
100 - ANS-95

All erosion and sediment control devices must be:

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller AnswersCOM. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $7.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

79650 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$7.99
  • (0)
  Add to cart