100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
Commercial Contractor Exam questions and correct answers (elaborations) with 100% accurate , verified , latest fully updated , 2024/2025 ,already passed , graded a+, complete solutions guarantee distinctions rationales| 5-star rating $11.49   Add to cart

Exam (elaborations)

Commercial Contractor Exam questions and correct answers (elaborations) with 100% accurate , verified , latest fully updated , 2024/2025 ,already passed , graded a+, complete solutions guarantee distinctions rationales| 5-star rating

 6 views  0 purchase
  • Course
  • Commercial Construction
  • Institution
  • Commercial Construction

Commercial Contractor Exam questions and correct answers (elaborations) with 100% accurate , verified , latest fully updated , 2024/2025 ,already passed , graded a+, complete solutions guarantee distinctions rationales| 5-star rating

Preview 2 out of 7  pages

  • August 5, 2024
  • 7
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • Commercial Construction
  • Commercial Construction
avatar-seller
AnswersCOM
Commercial Contractor Exam
__________ shall be equipped with an effluent filter designed to handle both the daily flow
volume and wastewater characteristics. - ANS-Outlet tees

___________ shall be located, installed, and constructed so that the temperature of the sewage
will be reduced to encourage congealing or separation of grease and for easy access for
cleaning. - ANS-Grease traps

_____________ will be constructed so a pass-through hole or slot equal to or greater than the
diameter of the inlet pipe is positioned below the liquid surface a minimum of 25% to a
maximum of 50% of the total liquid depth. - ANS-Compartment partitions

_______________ can be accomplished using pumps or siphons. - ANS-Dosing

________________ must be reinforced using 3/8 inch steel reinforcing rods (rebar) which shall
be spaced 12" on center each way extending a minimum of 2.5" and a maximum of 3" from the
outside of the tank lid. - ANS-Tank lids

________________ shall be a minimum of 15 inches free space and a maximum of 24 inches. -
ANS-Access openings

________________ shall be considered to meet the equivalency standard. - ANS-Cast iron

_________________ may be constructed of any of the materials approved for conventional
septic tanks. - ANS-Grease traps

__________________ may be accomplished by using an appropriately sized aerobic treatment
unit (ATU) that has been approved by the department of by using a unit that have been
reviewed by the EPD for that specific application. - ANS-Pretreatment

____________________ must be installed in accordance with the requirements listed in the
manual. - ANS-Riser and lid systems

____________________ the forms or mix may be helpful in eliminating "honeycombing" or
"bridging" in the finished product. - ANS-Vibrating

_____________________ is determined by adding the elevation difference between the lowest
water level in the tank and the elevation of the discharge outlet to the total friction losses that
occur in the pressure piping network. - ANS-Total dynamic head

, ______________________ should be cleaned regularly to prevent clogging. - ANS-Grease
traps

_________________________ are required when total linear length exceeds 1000 ft. -
ANS-Alternating absorption fields

____________________________ of poured in place septic systems shall have a minimum
thickness of 4 inches. - ANS-Walls, bottoms, and lids

Absorption field dosing is required when the total linear length exceeds _____________. -
ANS-500 feet

Additional reinforcement shall be required when the loads on a _________________ are
exceeded by subjecting it to vehicular traffic or when the top of the tank is placed deeper than 3
feet below the finished grade. - ANS-concrete tank

All ______________________________ for systems requiring electrical components should
meet the standards set forth in the Northern Electrical Code. - ANS-wiring and electrical
components

All dosing tanks must have an _________________________ of 60% to 75% the interior
volume of the absorption lines to be closed. - ANS-operating liquid capacity

All dosing tanks shall have ________________ that notify the owner of a malfunction. -
ANS-switches and alarms

All on-site sewage management systems larger than _____________ GPD must be designed
by and shall bear the stamp of an engineer registered in the state of GA. - ANS-2000

All solid pipe used in the installation of on-site sewage disposal systems shall be ___________
or equivalent. - ANS-schedule 40 PVC

All tanks shall be equipped with ______ inch PVC, ASTM 3034 rated or equivalent teens at the
inlet and outlet ends of the tank. - ANS-4

All tanks whether pre-made or constructed on site shall be constructed so the length is at least
______ times the width and shall have ______ compartments. - ANS-1 1/5; 2

Any contractor installing an ATU must be authorized by the ________________. -
ANS-manufacturer

Any facility that produces a waste stream with biological oxygen demand (BOD5) and total
suspended solids (TSS) higher than ___________ shall be required to pretreat the waste to

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller AnswersCOM. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $11.49. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

67163 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$11.49