100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
CMGT 360 chico pb Exam Questions with correct Answers 2024( A+ GRADED 100% VERIFIED). $11.49   Add to cart

Exam (elaborations)

CMGT 360 chico pb Exam Questions with correct Answers 2024( A+ GRADED 100% VERIFIED).

 0 view  0 purchase
  • Course
  • CMGT 360 chico pb
  • Institution
  • CMGT 360 Chico Pb

CMGT 360 chico pb Exam Questions with correct Answers 2024( A+ GRADED 100% VERIFIED).

Preview 2 out of 10  pages

  • August 6, 2024
  • 10
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • cmgt 360 chico pb exam
  • CMGT 360 chico pb
  • CMGT 360 chico pb
avatar-seller
KINGJAY
CMGT 360 chico pb
What is Design Build - ANS a method of project delivery in which one entity (design-builder)
forges a single contract with the Owner to provide for architectural engineering design services
and construction services

Five design build entity configurations - ANS • Contractor Led
• A/E Led
• Integrated Firm
• Developer Led
• Joint Venture

DB Contract (Three initial DB contract documents) - ANS •RFP
•Technical Proposal - drawings, written specifications,
renderings, models
•Price Proposal - Stipulated Sum proposed based on
Technical Proposal

Standard Form Design-Build Contracts - ANS • AIA (American Institute of Architects)
• EJCDC (Engineers Joint Contract Document Committee)
• AGC (Associated General Contractors Of America)
• DBIA (Design-Build Institute of America)

AIA distinction - ANS Pricing is not addressed in AIA agreements most significant distinction

Level of design in RFP - ANS Determines who controls the details of the design

Design Factors (Design Draw-Build) - ANS • 35% Design or Greater
• Typically Low Bid-Based Procurement (price only/no technical)

Programming - ANS a written statement of requirements of the building used as the basis for
design and the Owner's budget & Schedule

Schematic Design - ANS An investigation of different design alternatives that meets the
programming statement

Design Development - ANS Continuation of the Schematic design stage with design schemes
further developed on a system-by-system basis with more detail

Construction Documents - ANS Architect creates final working construction documents
necessary to bid the job for construction, pull permits and build the job in the field

, Owner "Approval" of Design - ANS • Design-Build like putting together a puzzle
• The Owner's RFP is like putting together the outside edges of the puzzle
• Owner approves for "Compliance Only" relative to RFP.
• Owner does not approve design details and methods outside the Owner's RFP performance &
programming requirements

Design/Cost Relationship Design-Build - ANS Designing to Budget Cost & Performance are
Fixed

Plans/Specs Warranty Design-Bid-build - ANS • Owner warrants the sufficiency of the plans &
specs to the Contractor (Spearin)
• Owner owns the "details" of Design
• Owner is liable for any "gaps" between the plans & specs and the Owner's requirements for
performance

Plans/Specs Warranty Design-Build - ANS •The Design-Builder warrants the sufficiency of the
plans & specs to the Owner
• Design-Builder owns the "details" of Design
• Design-Builder liable for any "gaps" between plans & specs ..... and Owner's requirements for
performance

Single Most Important Distinction between DBB and DB - ANS TEAM - An integrated,
multi-disciplined, collaborative approach

Gap Management - ANS Finding the holes in the plans and specs and filling them

who do you want on the bus - ANS People Who Focus on Solving the Problem Not on
Protecting Your Position

Integrated DB Teams - ANS An integrated, multi disciplined, collaborative approach to the way
a project team relates.

Design-Build Necessities - ANS •Communication
•Collaboration
•Integration

Committed Listening - ANS •Integrated Teams don't listen FROM: Their Position, Opinion,
Assessment, Judgment, or from Knowing.
•They Listen FOR:What's missing..., What works
•Focus on understanding

Co-Location - ANS where the designers and contractors are placed in close proximity to one
another, often in the same office or jobsite trailer

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller KINGJAY. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $11.49. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

79223 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$11.49
  • (0)
  Add to cart