2024 SEMINAR TEST 1 EXAM WITH
CORRECT ANSWERDS
During which major period of time were tasks related to project delivery
specialized and labor divided? - CORRECT ANSWERS-Industrial Revolution
The emergence of professional societies allowed for the development of:
A. all of these
B. ethical standards of practice
C. promotion and advocacy of professional interests
D. greater professional specialization - CORRECT ANSWERS-A. all of these
Why Owners Might Choose MP? - CORRECT ANSWERS-Owner has control over
the entire
process
Who is involved in Multi-Prime? - CORRECT ANSWERS-Owner, designer,
multiple subs
Singular responsibility for both design and construction was first codified: -
CORRECT ANSWERS-by Hammurabi
Successful Design-Build requires: - CORRECT ANSWERS-trust and flexibility
between participants
Project "fast tracking" can be facilitates in an integrated manner more
readily by using the following project delivery method: - CORRECT ANSWERS-
Design Build
What year was architecture established as a profession distinct from the
science of engineering and construction? - CORRECT ANSWERS-1456
___ is a contract model where the contractor who will eventually build the
project is on board at or near the beginning of design and continues to work
as a team member with the Designer and Owner throughout the project. -
CORRECT ANSWERS-Integrated Project Delivery
, What is the greatest difference between Design-Build and Integrated Project
Delivery? - CORRECT ANSWERS-Joint leadership of designer and constructor
from two organizations
BIM is a project delivery method like Design-Build. - CORRECT ANSWERS-
False
Design-Build Plus is a project delivery system where the D-B entity contracts
to provide services beyond design and construction. Which of the following
services is not provided by the Design-Build Plus project delivery method?
A. All of these are provided by D-B+
B. Site Acquisition
C. Planning and Programming
D. Maintenance and Operation - CORRECT ANSWERS-A. All of these are
provided by D-B+
Who is involved in DBB? - CORRECT ANSWERS-Owner, designer, constructor
Why Owners Might Choose DBB? - CORRECT ANSWERS-Owner has control
over the entire
process
Who is involved in CM-At-Risk - CORRECT ANSWERS-Owner, designer, CM-
constructor
Specialization or separation within the design and construction industries
became prevalent during which period of time (approximately)? - CORRECT
ANSWERS-1850s
Which of these events contributed to the separation of sectors within the
design and construction industries?
A. rise of professional societies
B. IPD model creation
C. DBIA formation
D. none of these - CORRECT ANSWERS-D. none of these
In which year was the Design-Build Institute of America (DBIA) founded? -
CORRECT ANSWERS-1993
The benefits of buying summaries with Stuvia:
Guaranteed quality through customer reviews
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
Quick and easy check-out
You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.
Focus on what matters
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
Frequently asked questions
What do I get when I buy this document?
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Satisfaction guarantee: how does it work?
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Who am I buying these notes from?
Stuvia is a marketplace, so you are not buying this document from us, but from seller Elitaa. Stuvia facilitates payment to the seller.
Will I be stuck with a subscription?
No, you only buy these notes for $14.09. You're not tied to anything after your purchase.