100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
CDT EXAM – Questions With Correct Detailed Answers $13.49   Add to cart

Exam (elaborations)

CDT EXAM – Questions With Correct Detailed Answers

 4 views  0 purchase
  • Course
  • CDT*
  • Institution
  • CDT*

CDT EXAM – Questions With Correct Detailed Answers

Preview 2 out of 15  pages

  • August 11, 2024
  • 15
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • CDT*
  • CDT*
avatar-seller
Studyhall
CDT EXAM – Questions With Correct Detailed Answers

Payment bonds Right Ans - They are usually issued by contractors. The
payment bond is referred to as the labor and material payment bond. They are
used to guarantee that subcontractors and material suppliers will pay. The
payments bounds. Contract bond is known as contract bond, and they are
issued by an insurance company or bank to guarantee completion of the
project by the contractor.

Who acquires and pays for the building permit? Right Ans - The contractor

Life cycle Right Ans - The life cycle of a facility, from concept through
construction to use and eventual deconstruction
(demolition), follows a number of stages: Project conception, project delivery
methods, design,
construction documents, bidding/negotiating/purchasing, construction, and
facility management.

Life cycle Right Ans - Includes, planning, construction, evaluation,
demolition

During the Planning/Pre-Design Phase, the A/E may be retained to: Right
Ans - Assist in financial feasibility studies

Planning/Pre-Design Phase Right Ans - Project conception is often a
creative stage for the owner; it requires a clear understanding of project
values and goals which become the basis of many decisions. A facility program
documents these decisions, resulting in a framework for future design
decisions, operational procedures, and determining project feasibility.

During which project phase does the A/E review the owner's program and
budget requirements and suggest alternative approaches? Right Ans -
Design

In which phase are the specifications produced? Right Ans - Design Phase-
Construction Documents

, The Construction Phase begins... Right Ans - When the agreement is
executed

The Design Phase includes Right Ans - Surveys ,Design Development,
Schematic Design,Bid Security

The specification type document prepared during the Design Development
phase is called the: Right Ans - Outline Specification

What activities take place in the planning/pre-design phase? Right Ans -
Feasibility studies and budget is set

Which phase fixes and describes the size and character of the entire project?
Right Ans - Design Phase - Design Development Phase

Whose responsibility is it to produce the shop drawings? Right Ans - The
Contractor

articles in PART 1 Right Ans - References and related documents,
summary, Definitions, Submittals and procedures , Sequencing and
Scheduling, transmital.

Part 1 general Right Ans - Describes administrative, procedural, and
temporary requirements unique to the section. PART 1 is an extension of
subjects covered in Division 01 and amplifies information unique to the
section.

Project/Site Conditions Right Ans - Existing conditions that affect the
application of other materials,Limitations such as temperature or weather
that affect proper installation,

An example of a level three section is: Right Ans - 052150 Open Web Steel
Joists

Division numbers are fixed, but specification section numbers and titles:
Right Ans - Are fixed for level two and three sections but can be individually
selected for level four sections

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller Studyhall. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $13.49. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

81113 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$13.49
  • (0)
  Add to cart