100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
SWM PR Exam questions with complete solutions $15.49   Add to cart

Exam (elaborations)

SWM PR Exam questions with complete solutions

 1 view  0 purchase
  • Course
  • SWM DEQ
  • Institution
  • SWM DEQ

SWM PR Exam questions with complete solutions

Preview 2 out of 14  pages

  • August 13, 2024
  • 14
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • SWM DEQ
  • SWM DEQ
avatar-seller
BRAINBOOSTERS
DEQ-
Stormwater
Management
Inspector test
with 100%
correct answers
What two plans in the SWPPP must be approved? - answer Erosion
and sediment control plans and stormwater management plans
must be approved.


Does the stormwater management plan address runoff during
construction or after? - answer The stormwater management plan
addresses post-construction stormwater runoff.


What impact does impervious cover have on water quality? -
answer The volume and velocity of stormwater runoff increases as
natural vegetation is replaced with roads, buildings, parking areas
and other impervious surfaces. The increase in stormwater runoff

, leads to an increase in pollutants, such as sediment and
phosphorus that are carried to waterways, which has a negative
effect on water quality.


What is the target pollutant in the water quality criteria ? - answer
Phosphorus


What is the lower limit of the range of imperviousness that scan
result in stream degradation? - answer 10%


The SWM regulation ensures water quantity is considered in
stormwater management planning to protect against which two
destructive forces? - answer Channel erosion and flooding.


Discuss how the rate of runoff changes after development. -
answer The rate of runoff increase after development because of
the replacement of vegetation with impervious surfaces. A larger
volume of water will travel more quickly through a stream
channel, potentially causing erosion and flooding.


A locality VSMP must be at least as stringent as what state
permit? - answer Construction GP (9VAC25-870-106).


What plans must a locality's ordinance require to be submitted
and approved? - answer ESC plan and SWM plan (9VAC25-870-
148)


List three violations for which a penalty may be imposed. - answer
(9VAC25-870-116)
*No registration date

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller BRAINBOOSTERS. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $15.49. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

75391 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$15.49
  • (0)
  Add to cart