100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
DBIA Test Questions and Answers 2024 with complete solution $17.99   Add to cart

Exam (elaborations)

DBIA Test Questions and Answers 2024 with complete solution

 4 views  0 purchase
  • Course
  • DBIA
  • Institution
  • DBIA

DBIA Test Questions and Answers 2024 with complete solution

Preview 2 out of 10  pages

  • August 13, 2024
  • 10
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • DBIA
  • DBIA
avatar-seller
Americannursingaassociation
DBIA Test Questions and Answers 2024 with complete
solution

How team members are organized, establishes when parties engage, determines
roles of parties, and determines sequence of design, procurement, and construction
(db, cmar, dbb) - ANSWER Project Delivery System

how team members are selected (QBS, best value, low price, sole source) -
ANSWER Procurement Method

how team members are paid (fp, gmp, cost reimbursement, target price, unit price) -
ANSWER contracting approach

linear, sequential process, A/E selected on qualifications, GC selected on low price,
design is fully completed without input from GC, A/E acting in owner's interests, with
a historically strong bond, process is well-established and understood - ANSWER
Design-Bid-Build (DBB)

similar org structure to DBB, construction manager selected by QBS or best value,
contractor provides precon services, negotiated gmp contracting approach, open
book estimating process, potential to fast track project, construction cost determined
before design completed, potential issues over what is reasonably inferable from
gmp design documents - ANSWER construction manager at risk

The owner contracts with one entity (a person or firm) to provide both design and
construction services, designer and contractor have a direct contractual relationship,
selected by QBS or best value, wide spectrum of contracting approaches and
organizational structures, single point responsibility, owner does not manage
designer, owner exposure to claims is significantly reduced - ANSWER Design-
Build

similar to design build, in industrial and power generation sectors, systems and
performance testing are central to scope, contractor will typically perform
engineering with its in-house staff, owner has need for single point responsibility,
contracts include plant and process performance guarantees, contract items include
performance and schedule liquidated damages and limitations of liability -
ANSWER engineer procure construct (epc)

owner contracts with multiple trade contractors, attributes are typically similar to dbb,
owner's ability to schedule and coordinate the work - ANSWER Multiple Prime
Contracting

, multi-party agreement - all parties equal, QBS procurement and target pricing
contract approach, private sector use (limited at this time), key: owner's ability to
accept risk - ANSWER Integrated Project Delivery (IPD)

Instead of government building and maintaining major infrastructure (such as
highway, water treatment plant), build and maintenance is outsourced to a private
company. Opposed by public sector unions. this is not considered a delivery system
but its underlying approaches are delivery systems and typically use DB. multiple
procurement and contracting approaches - ANSWER public-private partnership
(p3)

intense efforts to establish scope early in the process; drives early team formation to
include key trade subcontractors; can enable big decisions to be made early, affect
project outcomes at lowest cost, establish a need for co-location and collaboration,
and compress time during concurrent design and construction - ANSWER shift left

typically two-phase best value procurement with lump sum contract; owner defines
project requirements and scope of prescriptive work; use of performance-based
technical requirements with limited prescriptive specifications - ANSWER
traditional design build

design and price are progressively developed after the design-builder is under
contract; final project cost and schedule commitment is not established as part of the
selection process; two phases: preliminary services and final design and
construction services - ANSWER progressive design build

describe the end result - ANSWER criteria documents

prescribes how to achieve the end result - ANSWER bridging documents

prior to bidding, owner undertakes a process to design the project and all of its
details to 100% complete plans and specs. the owner is therefore responsible for
success or failure of details of the design, and warrants the sufficiency of design to
the contractor. the owner is therefore liable to the contractor for any gaps between
plans and specifications and owner's requirements for project performance -
ANSWER design bid build paradigm

the owner should define its performance requirements and award the contract on the
basis of preliminary design; this makes the design-builder responsible for completing
the design in accordance with the owner's performance requirements. that also
causes the design-builder to warrant the sufficiency of the design to meet the
owner's criteria and the sufficiency of the design to subcontractors/suppliers that
have no design responsibility - ANSWER design details responsibility

subdivides project by functional elements, focuses on systems and assemblies,
useful for preliminary information and early design phases, aligns with BIM models
and conceptual estimating - ANSWER uniformat

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller Americannursingaassociation. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $17.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

82871 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$17.99
  • (0)
  Add to cart