100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
PJM Generation Operation Exam 2024 Questions and Answers $16.49   Add to cart

Exam (elaborations)

PJM Generation Operation Exam 2024 Questions and Answers

 2 views  0 purchase
  • Course
  • Pjm
  • Institution
  • Pjm

PJM Generation Operation Exam 2024

Preview 2 out of 5  pages

  • August 14, 2024
  • 5
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • Pjm
  • Pjm
avatar-seller
julianah420
PJM Generation Operation Exam 2024


Control center facilities must have a minimum of how many days of fuel for the backup
generator? - answer5 days

If PJM ACE shows overgeneration, actual imports are: - answerLess than scheduled

Who should a generator contact at PJM to clear an outage ticket? - answerMaster
Coordinator

To correct for a slow or fast clock, system frequency schedules are offset by: -
answer+/-.02 Hz

What frequency would PJM set to correct for fast-time error? - answer59.98Hz

What frequency would PJM set to correct for slow-time error? - answer60.02Hz

What info is on an instantaneous reserve check? - answersynchronized (regulating and
non-regulating), quick start, secondary and beyond secondary reserves

Generators must provide PJM with a realistic Reactive Capability Curve. This curve
must have no less than __ points, and no more than __ points. - answerNo less than 2
and no more than 8 points

A classic indicator of voltage instability is when system voltages change greatly when...
- answersystem loads change by a small amount

Above the line of a D-curve... - answerLagging (pushing VARs). Generators will be set
there during high-load/low voltage conditions.

Below the line of a D-curve... - answerLeading (absorbing VARs). Generators will be set
there during low load/high voltage conditions.

MWs and MVARs have what kind of relationship? - answerInverse (increase in MW =
decrease in MVARs)

How often do generators need to test reactive power capability? - answerEvery 5 years

The computer hardware and software at each control center shall achieve an availability
level of what for those reliability functions directly affect the successful operation of
PJM? - answer99.95%

, What is EHV? - answerExtra high voltage. Classified as 345kv and above

Any generator that is a PJM generation capacity resource that has an RPM Resource
Commitment: - answer1. Must submit an offer schedule into the DA market even if it is
self-scheduled or unavailable due to outage
2. Generation capacity resources shall submit:
-A schedule of availability for the next seven days
-May submit non-binding offer prices for the days beyond the next Operating Day

What time period is the Market Participant Bid/Offer Period? - answer0800-1100

What time are DA Market results posted? - answer1330

What time period is the re-bid period? - answer1330-1415

What is the maximum for a generation capacity resource offer? - answer$2000/MWh

What is the cap for price-based offers? - answerPrice-based offers will be capped at the
lower of $2000/MWh or the corresponding cost-based offer when costs are above
$1000/MWh
Example:
If a unit's cost is $1500, the price offer can be no higher than $1500

If $800, price offer can be no higher than $1000

If $2200, price offer can be no higher than $2000

Real time real and reactive power telemetry: Generators participating in the PJM market
as... - answercapacity resources

Real time real and reactive power telemetry: Generators __ MW (Maximum facility
output) or larger - answer10MW

Real time real and reactive power telemetry: Generators greater than __ MW (Maximum
facility output) and connected at a bus operating at __ kV or greater - answer1MW; 50
kV

Real time real and reactive power telemetry: Solar parks __MW (Maximum Facility
Output) or greater - answer3 MW

Real time real and reactive power telemetry: Distributed generators modeled less than
__ MW (Maximum Facility Output) - answer10 MW

Real time real and reactive power telemetry: Public... - answerDistribution Microgrid
Generators

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller julianah420. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $16.49. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

67096 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$16.49
  • (0)
  Add to cart