100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
PJM Practice Questions Test Questions and Answers $15.99   Add to cart

Exam (elaborations)

PJM Practice Questions Test Questions and Answers

 2 views  0 purchase
  • Course
  • Pjm
  • Institution
  • Pjm

PJM Practice Questions Test

Preview 1 out of 3  pages

  • August 14, 2024
  • 3
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • Pjm
  • Pjm
avatar-seller
julianah420
PJM Practice Questions Test


What Component of LMP is the same for every bus in the PJM RTO? - answer System
Energy Price

What control signal is measured in MWs? - answer Economic basepoint

Which of the following are the two Ancillary Service Markets that PJM operates? -
answer Regulation and Synchronized Reserve markets

Who regulates PJM? - answer Federal Energy Regulatory Commission (FERC)

A Geomagnetic Disturbance Warning issued by PJM when the NOAA has issued a
warning or an alert for a potential GMD storm of what severity? - answerK7

During an Environmental Emergency Act Emergency, which entity must submit for the
request for variance to the appropriate government agency? - answerThe Generation
Owner

Warning issued when synch reserve requirements are less than synch reserve
requirement - answerVoltage reduction warning and Reduction of of Non-critical plant
load.

The purpose of the Heavy Load Voltage Schedule Warning is to have members prepare
for maximum support of voltages on the : - answerBulk Power System

During a suspected terrorism or sabotage event, PJM puts emphasis on what aspects
of operation? - answerOperation and Communication

PJM can issue Emergency Procedures in any order to keep reliable operations in the
RTO. The normal sequence of issuing Deploy All Resources is after: - answerissued
prior but no later than the same time as a Voltage Reduction Action

During a Heavy Load Voltage Schedule Action, all Generation Owners/Operators will be
directed to: - answerMaintain a MVAR reserve on units connected at the EHV level

What information does PJM provide to members during a Minimum Generation Alert? -
answer-Adjusted Minimum Generation
-Valley and Load estimate

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller julianah420. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $15.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

67096 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$15.99
  • (0)
  Add to cart